| Plan Review Notes For Permit 19061267 |
| Permit Number |
19061267 |
|
| Review Stop |
B |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-03-02 18:40:38 | PLAN | | | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SOME OF THE INFORMATION PROVIDED IN THE INSTALLATION | | | SCHEDULE APPEARS TO BE INCORRECT. FBC 107.2.1 | | | A) THE SHUTTER SPANS SHOULD BE MORE THAN THE OPENING | | | HEIGHT BASED ON THE EDGE DISTANCE REQUIREMENTS. PLEASE | | | CORRECT. | | | B) BASED ON THE POURED CONCRETE ANCHOR SPACING SCHEDULE | | | ON SHEET 12, THE SPACING OF THE ANCHORS FOR WALL HEADER | | | MOUNTING "A" AND WALL SILL MOUNTING "D" IS 10" FOR A | | | NEGATIVE DESIGN LOAD OF 60 PSF. YOU USE NEGATIVE 60 PSF | | | BECAUSE THE WALL PRESSURE FOR THE OPENINGS IS MORE THAN | | | 40 PSF AND 60 PSF IS THE NEXT HIGHER PRESSURE ON THE | | | SCHEDULE. PLEASE CORRECT. | | | |
|