| Date |
Text |
| 2019-07-19 19:00:27 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) COMPLIED. |
| | |
| | 2) COMPLIED. |
| | |
| | 3) PARTIALLY COMPLIED. THE INFORMATION PROVIDED IS |
| | INCOMPLETE. THE INSTALLATION SCHEDULE SPECIFIES THAT |
| | THE SUBSTRATE IS WOOD FOR BOTH THE FIRST AND SECOND |
| | FLOORS. THE PROPERTY APPRAISER'S WEBSITE INDICATES THAT |
| | THE FIRST FLOOR IS CBS AND THE SECOND FLOOR IS WOOD |
| | FRAME STUCCO. THE ACCORDION SHUTTERS ARE ALWAYS |
| | INSTALLED VERTICALLY NOT HORIZONTALLY AS SPECIFIED ON |
| | THE SCHEDULE. THE TYPE OF ANCHOR IS LISTED AS ALL POINT |
| | SOLID SET IN ONE PLACE AND TAPCON 2 1/4" IS LISED IN |
| | THE SCHEDULE. THE SHUTTER MOUNTING IS SPECIFIED AS #14 |
| | AND I WAS UNABLE TO DETERMINE WHICH MOUNTING YOU WILL |
| | USE. PLEASE CIRCLE THE MOUNTINGS AND ANCHOR SPACINGS |
| | YOU WILL USE IN THE PRODUCT APPROVAL DETAILS AND ANCHOR |
| | SCHEDULES. FBC 107.2.1 FBC - R 301.2.1.2 SUBMIT TWO |
| | COPIES OF AN INSTALLATION SCHEDULE AND KEY PLAN FOR THE |
| | STORM PANELS. SPECIFY THE OPENING SIZE, THE WIND |
| | PRESSURES, TYPE OF ANCHOR, ANCHOR SPACING, EDGE |
| | DISTANCE, PANEL LENGTH, PANEL SPAN, SEPARATION DISTANCE |
| | FROM PANEL TO GLASS AND THE APPLICABLE SECTION NUMBER |
| | FROM THE INSTALLATION DRAWINGS. I HAVE INCLUDED A LINK |
| | TO THE CONSTRUCTION SERVICES DEPARTMENT SITE THAT HAS |
| | MANY OF THE RELATED FORMS INCLUDING THE SCHEDULE FOR |
| | INSTALLATION OF OPENING PROTECTIVE DEVICES. |
| | HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/ |
| | |
| | |
| | |
| | |