| Date |
Text |
| 2019-06-25 15:05:04 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) SHEET 02 - THERE IS AN INDICATION UNDER THE CALL-OUT |
| | DRAWING OF THE MTAL STUD PARTITION, "REFER TO FINSIH |
| | SCHEDULE FOR APPLIED FINISHES." |
| | |
| | THERE IS NO FINISH SCHEDULE FOR REFERRING. |
| | |
| | PER NFPA 101, CH 38, NEW BUSINESS OCCUPANCIES |
| | |
| | 38.3.3 INTERIOR FINISH. |
| | 38.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN |
| | ACCORDANCE WITH |
| | SECTION 10.2. |
| | 38.3.3.2 INTERIOR WALL AND CEILING FINISH. |
| | 38.3.3.2.1 INTERIOR WALL AND CEILING FINISH MATERIAL |
| | COMPLYING WITH |
| | SECTION 10.2 SHALL BE CLASS A OR CLASS B IN EXITS AND |
| | IN EXIT ACCESS |
| | CORRIDORS. |
| | 38.3.3.2.2 INTERIOR WALL AND CEILING FINISHES SHALL BE |
| | CLASS A, |
| | CLASS B, OR CLASS C IN AREAS OTHER THAN THOSE SPECIFIED |
| | IN |
| | 38.3.3.2.1. |
| | |
| | PLEASE PROVIDE DETAILS IN COMPLIANCE WITH THE CODE. |
| | |
| | |
| | |
| | 2) SHEET 00 - THERE IS AN INDICATION UNDER D. FLOORING, |
| | "SEE SCHEDULE FOR ALLOWANCES FOR NEW FLOORING" |
| | |
| | THERE IS NO SCHEDULE FOR REFERRING. |
| | |
| | PER NFPA 101, CH 38, NEW BUSINESS OCCUPANCIES |
| | |
| | 38.3.3.3 INTERIOR FLOOR FINISH. |
| | 38.3.3.3.1 INTERIOR FLOOR FINISH SHALL COMPLY WITH |
| | SECTION 10.2. |
| | 38.3.3.3.2 INTERIOR FLOOR FINISH IN EXIT ENCLOSURES |
| | SHALL BE CLASS |
| | I OR CLASS II. |
| | 38.3.3.3.3 INTERIOR FLOOR FINISH SHALL COMPLY WITH |
| | 10.2.7.1 OR |
| | 10.2.7.2, AS APPLICABLE. |
| | |
| | PLEASE PROVIDE DETAILS IN COMPLIANCE WITH THE CODE. |
| | |
| | |
| | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |
| | |