Plan Review Notes
Plan Review Notes For Permit 19060992
Permit Number 19060992
Review Stop ENG
Sequence Number 2
Notes
Date Text
2019-07-17 16:05:03PASSED WITH PROVISOS:
  
 COORDINATE MOT WITH MR. GORDON PATRIE AT 561-494-1082.
  
 COORDINATE HOLD HARMLESS DOCUMENT AS PREVIOUSLY
 REQUESTED.
  
 STORM WATER POLLUTION PREVENTION SUMMARY (SWPPP)
  
 THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT
 PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP. ADDITIONAL
 BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS
 DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO THE
 OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION.
  
 BEST MANAGEMENT PRACTICES AND CONTROLS SHALL CONFORM TO
 FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF
 PRACTICE, AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT
 ADDITIONAL CONTROLS AS DIRECTED BY THE PERMITTING
 AGENCY OR THE OWNER.
  
 EROSION CONTROLS MUST BE CONSIDERATE OF NEARBY STATE
 WATERS AT ALL TIMES.
  
 ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING,
 EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND
 PROPERLY TREATED OR DISPOSED.
  
 SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND
 FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY
 AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL
 SPILLS AND LEAKS, IF APPLICABLE
  
 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF
 DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING
 CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR
 OTHER SUITABLE METHODS OF CONTROL. THE USE OF MOTOR
 OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR
 DUST SUPPRESSION OPERATIONS IS PROHIBITED. THE
 CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS
 PERTAINING TO ENVIRONMENTAL PROTECTION.
  
 RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH
 MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS.
 MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES
 THROUGH THE ACTION OF WIND OR STORM WATER DISCHARGE
 INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
  
 THE CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL
 EXISTING AND PROPOSED DRAINAGE STRUCTURES FOR THE
 DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE
 PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURES AND PIPES
 WITHIN THE LIMITS OF CONSTRUCTION SHALL BE CLEANED OF
 DEBRIS AS REQUIRED DURING AND AT THE END OF
 CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS.
  
 ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM
 VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE
 REMOVED AS SOON AS POSSIBLE.
  
 THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY
 SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER
 DRAINAGE SYSTEMS IN CONJUNCTION WITH THE DEMOLITION,
 CONSTRUCTION, OR STABILIZATION OF THE SITE.
  
 BROKEN DEBRIS SHALL BE REMOVED FROM THE SITE AS SOON AS
 PRACTICAL. EXCAVATED MATERIALS SHALL NOT BE STOCKPILED
 IN THE RIGHT-OF-WAY OR EASEMENT DURING CONSTRUCTION.
  
 CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLIANCE
 WITH THE STATE OF FLORIDA TRENCH SAFETY ACT.
 HTTP://DEP.STATE.FL.US/WATER/STORMWATER/INDEX.HTM
 HTTP://DEP.STATE.FL.US/WATER/STORMWATER/NPDES/SWPPP.HTM
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. MORE INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  