| 2019-06-24 11:47:29 | GAS 1ST REVIEW**DENIED**NOTE - A COMPREHENSIVE REVIEW |
| | COULD NOT BE DONE AT THIS TIME AND ADDITIONAL PLAN |
| | REVIEW COMMENTS MAY BE GENERATED UPON THE RE-REVIEW OF |
| | SUBMITTED CORRECTIONS. |
| | |
| | |
| | 1) SHT E3.1 CALLS OUT FOR BOTH A GAS COOK TOP AND GAS |
| | RANGE BUT GAS ISOMETRIC ONLY SHOWS A COOK TOP. PROVIDE |
| | GAS STOVE ON PLAN AND LIST BTU'S. LIST THE BTU LOAD OF |
| | EACH APPLIANCE AND THE TOTAL BTU LOAD ON THE SYSTEM. |
| | REFER TO THE 2017 FBC-RES. SEC. G2413.3, G2413.4 AND |
| | TABLES G2413.4 (1 ) THROUGH G2413.4 (21). |
| | |
| | 2) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 |
| | FBC-RES. SEC. G 2407.1 AND G2439.4 (CLOTHES DRYERS). |
| | |
| | 3) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| | APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. FBCR |
| | G2407.9.3. |
| | |
| | 4) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2017 FBC-RES. SEC. G2421.1. |
| | |
| | 5) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| | APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 |
| | OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE |
| | PROPER PIPE SIZE AND BTU LOAD. |
| | |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR |
| | CITY OF WEST PALM BEACH |
| | 561-248-2703 |
| | [email protected] |
| | [email protected] |
| | |
| | |
| | |
| | |