| Plan Review Notes For Permit 19060211 |
| Permit Number |
19060211 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2019-06-06 07:42:43 | 1) SUBMIT A ROOF PLAN SHOWING THE LOCATION OF THE ROOF | | | DRAINS AND THE TERMINATION POINTS OF THE STORM DRAIN | | | PIPING. WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) CLEANOUTS ARE REQUIRED IN THE STORM RISERS PER 2017 | | | FBC-PLUMBING SEC.1101.8. | | | 3) WHAT PROVISIONS ARE BEING MADE FOR SECONDARY | | | (EMERGENCY OVERFLOW) PROVISIONS? INDICATE ON THE | | | PLANS.WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) ROOF DRAINAGE SHALL DISCHARGE A MINIMUM OF ONE FOOT | | | AWAY FROM THE STRUCTURE SIDEWALL PER 2017 FBC-BUILDING | | | SEC.1503.7. | | | 5) SUBMIT CALCULATIONS FOR THE ROOF DRAIN SIZING. | | | COMPLY WITH 2017 FBC-PLUMBING SEC. 1105.2. SUBMIT | | | MANUFACTURER'S SPECIFICATIONS FOR THE TYPE OF ROOF | | | DRAINS BEING INSTALLED. | | | 6) INDICATE ON THE PLANS THE TYPE OF MATERIAL BEING | | | INSTALLED FOR THE STORM DRAIN PIPING ABOVEGROUND.2017 | | | FBC-PLUMBING TABLE 702.1. | | | 7) INDICATE ON THE PLANS WHERE AND HOW THE ABOVEGROUND | | | PIPING IS CONNECTING TO ANY UNDERGROUND PIPING. WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|