| 2019-06-04 16:50:15 | PLUMBING 1ST REVIEW**DENIED** |
| | |
| | 1) PROVIDE 2 CLEAN COPIES OF PLANS. PLANS THAT BEAR |
| | APPROVAL STAMPS FOR ANY BUILDING DEPARTMENT WILL NOT BE |
| | ACCEPTED. YOUR PLANS HAVE APPROVAL STAMPS FROM THE |
| | VILLAGE OF WELLINGTON.FBC 107.3.5 |
| | |
| | 2) IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS |
| | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS |
| | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE |
| | TDH CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, |
| | 4.4.9.1 |
| | |
| | 3) YOUR ANSI/ APSP DATED 4/4/12 APPEARS TO BE OUTDATED. |
| | THE CRRENT VERSION OF ANSI/ APSP IS 2013 WHICH WENT |
| | INTO EFFECT 12/31/2017. SUBMIT TOTAL DYNAMIC HEAD |
| | CALCULATIONS FOR THE MAXIMUM SYSTEM FLOW. THE MAXIMUM |
| | FLOW OF THE PUMP FROM ITS PUMP CURVE AND THE SIMPLIFIED |
| | TOTAL DYNAMIC HEAD CALCULATION IS NO LONGER ALLOWED TO |
| | BE USED IN DETERMINING MAXIMUM SYSTEM FLOW RATE PER |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| | EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE |
| | (GPM). IT REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES |
| | NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION |
| | OUTLET FITTING ASSEMBLY (DRAIN COVER).THE TDH |
| | CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS |
| | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| | EXCEPT THE PUMP. |
| | |
| | 4) PLUMBING NOTE #10 REFERS TO TESTING WITH AIR. PLEASE |
| | REMOVE THAT NOTE AS AIR TESTING ON P.V.C IS NOT |
| | PERMITTED. FBC 312.1, 303.2 |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 1ST FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | 561-248-2703 |
| | [email protected] |