| Date |
Text |
| 2019-12-04 09:22:18 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2017 6TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1. |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| | 6TH EDITION |
| | FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017 |
| | 6TH EDITION |
| | FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION |
| | NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE |
| | FS = FLORIDA STATUTES |
| | FAC = FLORIDA ADMINISTRATIVE CODE |
| | |
| | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| | SATISFACTORILY ARE MARKED AS CORRECTED. PREVIOUS |
| | COMMENTS THAT HAVE NOT BEEN ADDRESSED SATISFACTORILY |
| | HAVE ADDITIONAL COMMENTS IN PARENTHESES. ANY NEW |
| | COMMENTS WILL BE LISTED AFTER PREVIOUS COMMENTS. |
| | |
| | 1. CORRECTED. |
| | 2. CORRECTED. |
| | 3. PROVIDE THE ADDITIONAL AUTOMATIC LIGHTING CONTROLS |
| | STIPULATED IN THE FBC ENERGY CODE. FBC EC C405.2 (NOT |
| | CORRECTED, NO RESPONSE PROVIDED.) |
| | |
| | NEW COMMENTS: |
| | |
| | 4. PROVIDE CLARIFICATION FOR RISER DIAGRAM. RISER SHOWS |
| | AN EXISTING PANEL B WITH A J-BOX UNDERNEATH THAT WILL |
| | FEED NEW PANEL A, BUT THE RISER ALSO SHOWS AN EXISTING |
| | PANEL A. WILL PANEL B REMAIN, OR WILL IT BE |
| | REPLACED/RELOCATED? WILL THERE BE TWO PANEL A'S? THE |
| | RISER IS CONFUSING. PROVIDE CORRECTIONS. NEC 215.5; WPB |
| | FBC 107.2.1 |
| | 5. AN EQUIPMENT GROUNDING CONDUCTOR IS REQUIRED TO BE |
| | INSTALLED AFTER THE FIRST MEANS OF DISCONNECT. PROVIDE |
| | CORRECTION. NEC 250.24, 250.110, 250.118, 250.122 |
| | 6. FOR RE-WORK OF ELECTRICAL SERVICE, PROVIDE AVAILABLE |
| | SHORT CIRCUIT CALCULATION FOR SERVICE INCLUDING |
| | INFORMATION FROM THE POWER COMPANY STATING WHAT THE |
| | AVAILABLE SHORT CIRCUIT CURRENT IS FOR THE SERVICE TO |
| | CONFIRM THE STATED AIC RATING OF THE SERVICE EQUIPMENT |
| | IS ADEQUATE. NEC 110.9, 110.10 |
| | 7. PROVIDE NOTES TO INDICATE THE REQUIRED MARKING OF |
| | SERVICE EQUIPMENT FOR ARC FLASH HAZARD WARNING AND |
| | AVAILABLE FAULT CURRENT PER CODE. NEC 110.16, 110.24 |
| | 8. LOAD CALCULATION AND PANEL SCHEDULES SHOW THE SYSTEM |
| | AS 120/240 VOLT 3 PHASE. THIS SYSTEM WOULD HAVE A HIGH |
| | LEG ON B PHASE AND 120 VOLT LOAD COULD NOT BE CONNECTED |
| | TO THIS. THIS WOULD ALSO REQUIRE MARKING OF B PHASE PER |
| | NEC 110.15. IS THIS IN FACT A HIGH LEG SYSTEM? OR IS |
| | THIS A 120/208 VOLT 3 PHASE SYSTEM? PROVIDE |
| | CLARIFICATION AND CORRECTIONS AS NEEDED. NEC 110.3, |
| | 110.15, 215.5, 408.30; WPB FBC 107.2.1 |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES |
| | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY |
| | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED |
| | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD |
| | SHEETS. |
| | |
| | SINCERELY, |
| | |
| | JOHN PEARSON |
| | ELECTRICAL PLANS EXAMINER |
| | 561-805-6746 |
| | [email protected] |
| | |