| 2019-07-30 13:15:58 | BUILDING REVIEW COMMENTS: |
| | |
| | W.P.B. PERMIT: 19051257 |
| | REVIEWED: JULY 30, 2019 |
| | |
| | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER PX4191 |
| | [email protected] |
| | 561-805-6718 |
| | |
| | F.S. 553.79(5) THRESHOLD BUILDING. |
| | THIS PROJECT MEETS THE DEFINITION OF A THRESHOLD |
| | BUILDING. THE FOLLOWING IS REQUIRED PRIOR TO |
| | COMMENCEMENT. |
| | A) ALL PLANS ARE TO INCLUDE THE THRESHOLD STATEMENT |
| | REQUIRED BY FS553.79(7)(D). ALL PLANS FOR THE BUILDING |
| | WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE |
| | ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT |
| | THAT, TO THE BEST OF THE ARCHITECT?S OR ENGINEER?S |
| | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE |
| | APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE |
| | FIRE SAFETY STANDARDS AS DETERMINED BY THE LOCAL |
| | AUTHORITY IN ACCORDANCE WITH THIS CHAPTER 553 AND |
| | CHAPTER 633. |
| | -PLEASE INCLUDE THIS STATEMENT ON ANY NEW SHEETS |
| | SUBMITTED BY STRUCTURAL ENGINEER AND AT LEAST MAKE SURE |
| | IT GETS PUT ON SHEET S1.2 STRUCTURAL INSPECTIO PLAN. |
| | B) OK - THRESHOLD INSPECTION PLAN FOUN D ON SHEET S1.2, |
| | FS553.79(5)A). - OK |
| | C) COMPLETE THE THRESHOLD / SPECIAL INSPECTOR AGREEMENT |
| | OF UNDERSTANDING. IF PDF OF AGREEMENT IS NEEDED PLEASE |
| | CONTACT THE BUILDING PLAN REVIEWER AND THEY WILL |
| | PROVIDE VIA E-MAIL ([email protected]) |
| | D) PROVIDE RESUMES AND COPIES OF LICENSES FOR ALL |
| | PROPOSED INSPECTORS. PLEASE INCLUDE AS MANY ADDITIONAL |
| | INSPECTORS AS POSSIBLE BECAUSE THESE ARE THE ONLY |
| | PEOPLE THAT THE CHIEF BUILDING INSPECTOR WILL ALLOW TO |
| | BE ON-SITE. |
| | |
| | |