| Date |
Text |
| 2019-09-13 16:46:22 | 1- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | FAC 61G20-3.001 FOR ROOFING AT NEW COVERED TERRACE. |
| | NOTE: COORDINATE WITH ITEM #4(B) ABOVE. |
| | |
| | ORIGINAL COMMENT: |
| | A)IF FLAT ROOF, THEN PROVIDE THE FOLLOWING: |
| | PROVIDE PRODUCT APPROVAL (2 COPIES) FOR FLAT ROOF AS |
| | REQUIRED BY FAC 61G20-3.001 AND CLEARLY MARK WHICH |
| | APPROVED ASSEMBLY IS GOING TO BE INSTALLED TO VERIFY |
| | COMPLIANCE WITH THE DESIGN PRESSURES OF SEC. R301.2.1 |
| | FBC-RESIDENTIAL. NOTE: IF THE SELECTED ASSEMBLY DOESN'T |
| | MEET THE DESIGN PRESSURES FOR ALL ROOF ZONES, THEN |
| | SIGNED AND SEALED RAS 117 CALCULATIONS ARE REQUIRED. |
| | |
| | RESPONSE: |
| | THIS MAY BE SUBMITTED LATER AS A DEFERRED SUBMITTAL. |
| | BUT BEFORE INSPECTIONS TO AVOID CONFLICTS/DELAYS. |
| | |
| | ORIGINAL COMMENT: |
| | B)IF TILE ROOF, THEN PROVIDE THE FOLLOWING: |
| | - ENGINEER OF RECORD TO SPECIFY ROOF TILE FASTENING IN |
| | THE CONSTRUCTION DOCUMENTS. SEC. 107.2.1.1 CITY |
| | AMENDMENTS. IF SPECIFYING ROOF TILE ADHESIVE, THEN |
| | PROVIDE PRODUCT APPROVAL. IF SPECIFYING SCREWS, THEN |
| | SPECIFY SCREW SIZE AND NUMBER OF SCREWS. |
| | -ROOF TILE PRODUCT APPROVAL AND CLEARLY MARK ROOF TILE |
| | FASTENING METHOD AS REQUIRED BY CITY POLICY FOR ALL |
| | ROOFING PERMITS. |
| | |
| | RESPONSE: |
| | ENGINEER NEEDS TO PROVIDE THE ROOF TILE FASTENING |
| | METHOD. IF USING SCREWS, THEN NEED TO SPECIFY SIZE AND |
| | NUMBER OF SCREWS. |
| | |
| | ORIGINAL COMMENT: |
| | 2- OWNER/BUILDER NEEDS TO COMPLETE ROOFING PERMIT |
| | APPLICATION ALSO. SEC/ 105.1 CITY AMENDMENTS. |
| | |
| | RESPONSE: |
| | NEED THE ROOFING PRODUCT APPROVALS BEFORE ISSUING THE |
| | ROOFING SUB-PERMIT. ROOFING PERMIT APPLICATION WILL BE |
| | ON HOLD UNTIL PRODUCT APPROVALS ARE SUBMITTED. |
| | |