2019-05-15 11:41:51GAS 1ST REVISION REVIEW**DENIED** PLEASE CLOUD ALL
 CHANGES THIS REVISION PERTAINS TOO. FBC 107.3.5
  
 1) NO INCREASE OF VALVE PROVIDE. WITH THE LARGE AMOUNT
 OF ADDED GAS APPLIANCES AND THE RECONFIGURATION OF THE
 COTTAGE WITH COMPLETED KITCHEN YOU MUST PROVIDE THE
 INCREASE VALUE. THE GENERATOR SHALL NOT BE PART OF THIS
 AS IT WILL BE ASSET ON IT STAND ALONG PERMIT. WPB AMED
 109.3
  
 2) THE REVISED TAKAGI TANKLESS HEATER (E.F80%) SHOWN IS
 A COMMERCIAL UNIT THAT DOES NOT MEET THE FEDERAL MIN
 EFFICIENCY REQUIRED OF .82%. ANY CHANGING OF THE WATER
 HEATER FROM THE APPROVED MODEL EFFICIENCY WILL REQUIRED
 A NEW R405-2017 ENERGY FORM BE COMPLETED AND SUBMITTED.
 10 FCR 429, 10 FCR 430.22 (D)
  
 3) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND 2017
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
  
 4) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR
 EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. YOU
 CALL OUT ALL EXTERIOR PIPING TO BE P.E BUT P.E IS NOT
 APPROVED FOR USE ABOVE GROUND. FBC 107.2.1
  
 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017
 FBC-FUEL GAS CODE SEC.304.1,2017 FBC-RES. SEC. G 2407.1
 AND G2439.4 (CLOTHES DRYERS).
  
 6) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS
 APPLIANCES BOTH RANGE/ COOK TOPS. WHERE COMBUSTION AIR
 IS PROVIDED BY THE BUILDING?S MECHANICAL VENTILATION
 SYSTEM, THE SYSTEM SHALL PROVIDE THE SPECIFIED
 COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED
 VENTILATION AIR. 2017 FBCR G2407.9.3.
  
 7) PROVIDE CORRECT SIZING TABLES FOR ENTIRE SYSTEM AND
 ALL MATERIALS AND PRESSURES BEING USED.FBC RES G2413.3
  
 8) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1.
  
 9) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE
 APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1
 OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE
 PROPER PIPE SIZE AND BTU LOAD.
  
 10) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. 2017 FBC-RES. SEC. G2421.1
  
  
 TIM HUNT
 PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 561-248-2703
 [email protected]
 [email protected]
  
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved