Plan Review Notes
Plan Review Notes For Permit 19050386
Permit Number 19050386
Review Stop NFIP
Sequence Number 1
Notes
Date Text
2019-06-05 08:35:42ADDRESS: 110 FLAGLER LANE PERMIT # 19050386
 TYPE: BLD-RES NEW SFR
  
 BUILDING PLAN REVIEW - NFIP
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 BUILDING PLANS EXAMINER, PX3169
 1&2 FAMILY PLANS EXAMINER, SFP306
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 1ST REVIEW
 RESULTS: DENIED
 YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED
 BELOW.
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 CODES IN EFFECT:
 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 FBC CE = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 FBC EX = FLORIDA BUILDING CODE EXISTING BUILDING 2017
 6TH EDITION
 FBC M = FLORIDA BUILDING CODE MECHANICAL 2017 6TH
 EDITION
 FBC P = FLORIDA BUILDING CODE PLUMBING 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 NFIP REVIEW
 CITY OF WEST PALM BEACH ORDINANCE NO. 4658-16
 AS OF OCTOBER 5, 2017, THE FEDERAL EMERGENCY MANAGEMENT
 AGENCY (FEMA) ESTABLISHED A NEW FLOOD INSURANCE RATE
 MAP (FIRM) UTILIZING THE RECENTLY COMPLETED FLOOD
 HAZARD DETERMINATION (FHD) FOR THE CITY OF WEST PALM
 BEACH, FL.
 ALL NEW BASE FLOOD ELEVATIONS (BFE) SHALL BE BASED ON
 NAVD88 DATUM. ON AUGUST 23, 2017, THE CITY OF WEST PALM
 BEACH, BY ORDINANCE, NO. 4658-16, ESTABLISHED A TWO
 FOOT FREEBOARD ABOVE THE (BFE).
  
 1. THIS STRUCTURE IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA. DESIGNATED FLOOD ZONE IS AE WITH A BASE FLOOD
 ELEVATION OF 7.0 FEET NAVD88. THE FOLLOWING CONDITIONS
 SHALL APPLY.
  
 NFIP
  
 1. BASED ON THE SUBMITTED SURVEY, THIS LOT AND PROPOSED
 IMPROVEMENTS ARE LOCATED IN AN AE FLOOD ZONE WITH A
 BASE FLOOD ELEVATION (BFE) OF 7.0 FEET NAVD.
 2. AS OF OCTOBER 5, 2017, THE FEDERAL EMERGENCY
 MANAGEMENT AGENCY (FEMA) ESTABLISHED A NEW FLOOD
 INSURANCE RATE MAP (FIRM) UTILIZING THE RECENTLY
 COMPLETED FLOOD HAZARD DETERMINATION (FHD) FOR THE CITY
 OF WEST PALM BEACH, FL.
 3. ALL NEW BASE FLOOD ELEVATIONS (BFE) SHALL BE BASED
 ON NAVD88 DATUM. ON AUGUST 23, 2017, THE CITY OF WEST
 PALM BEACH, BY ORDINANCE, ESTABLISHED A TWO FOOT
 FREEBOARD ABOVE THE (BFE).
 4. YOU MAY SUBMIT A SURVEY SHOWING ALL EXISTING AND
 PROPOSED ELEVATIONS BASED ON NAVD88 DATUM PLUS TWO FEET
 OF FREEBOARD OR THE ENGINEER OF RECORD (EOR) MAY ADD A
 STATEMENT TO THE STRUCTURAL PLAN THAT THE DESIGN FLOOD
 ELEVATION (DFE) WILL BE 9.4 FEET NAVD88 BASED ON THE
 (BFE) OF 7.00 FEET FOR FLOOD ZONE AE PLUS A CORRECTION
 FACTOR OF .4 FEET PLUS TWO FEET OF FREEBOARD.
  
 2. ELEVATION CERTIFACES ARE REQUIRED AS FOLLOWS:
  
 A CONSTRUCTION DRAWING ELEVATION CERTIFICATE IS
 REQUIRED AT TIME OF PERMIT APPLICATION.
 NOTE: ALL EQUIPMENT SERVICING THE BUILDINGS ON THIS
 SITE ARE REQUIRED TO BE AT OR ABOVE 9 FEET 4 INCHES
 NAVD.
  
 AN UNDER CONSTRUCTION (FORMBOARD) SURVEY WITH FINISHED
 FLOOR ELEVATION IS REQUIRED.
  
 A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS
 REQUIRED AND SHALL BE SUBMITTED FOR REVIEW AND APPROVAL
 PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY.
 THIS EC MAY BE SUBMITTED FOR REVIEW PRIOR TO BUILDING
 FINAL.
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved