| 2019-10-01 15:44:33 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) INSTALL AND TEST PER NFPA 110 IF SUPPLYING POWER TO |
| | ANY LIFE SAFETY EQUIPMENT. |
| | |
| | PER NFPA 110 |
| | |
| | 1.1 SCOPE. THIS STANDARD CONTAINS REQUIREMENTS COVERING |
| | THE |
| | PERFORMANCE OF EMERGENCY AND STANDBY POWER SYSTEMS |
| | PROVIDING |
| | AN ALTERNATE SOURCE OF ELECTRICAL POWER TO LOADS IN |
| | BUILDINGS |
| | AND FACILITIES IN THE EVENT THAT THE PRIMARY POWER |
| | SOURCE |
| | FAILS. |
| | 1.1.1 POWER SYSTEMS COVERED IN THIS STANDARD INCLUDE |
| | POWER |
| | SOURCES, TRANSFER EQUIPMENT, CONTROLS, SUPERVISORY |
| | EQUIPMENT, |
| | AND ALL RELATED ELECTRICAL AND MECHANICAL AUXILIARY AND |
| | ACCESSORY |
| | EQUIPMENT NEEDED TO SUPPLY ELECTRICAL POWER TO THE LOAD |
| | TERMINALS OF THE TRANSFER EQUIPMENT. |
| | 1.1.2 THIS STANDARD COVERS INSTALLATION, MAINTENANCE, |
| | OPERATION, |
| | AND TESTING REQUIREMENTS AS THEY PERTAIN TO THE |
| | PERFORMANCE |
| | OF THE EMERGENCY POWER SUPPLY SYSTEM (EPSS). |
| | |
| | 1.1.3 THIS STANDARD DOES NOT COVER THE FOLLOWING: |
| | (1) APPLICATION OF THE EPSS |
| | (2) EMERGENCY LIGHTING UNIT EQUIPMENT |
| | (3) DISTRIBUTION WIRING |
| | (4) UTILITY SERVICE WHEN SUCH SERVICE IS PERMITTED AS |
| | THE EPSS |
| | (5) PARAMETERS FOR STORED ENERGY DEVICES |
| | (6) THE EQUIPMENT OF SYSTEMS THAT ARE NOT CLASSED AS |
| | LEVEL 1 |
| | OR LEVEL 2 SYSTEMS IN ACCORDANCE WITH CHAPTER 4 OF THIS |
| | STANDARD |
| | |
| | 4.4* LEVEL. THIS STANDARD RECOGNIZES TWO LEVELS OF |
| | EQUIPMENT |
| | INSTALLATION, PERFORMANCE, AND MAINTENANCE. |
| | 4.4.1* LEVEL 1 SYSTEMS SHALL BE INSTALLED WHERE FAILURE |
| | OF THE |
| | EQUIPMENT TO PERFORM COULD RESULT IN LOSS OF HUMAN LIFE |
| | OR |
| | SERIOUS INJURIES. |
| | 4.4.2* LEVEL 2 SYSTEMS SHALL BE INSTALLED WHERE FAILURE |
| | OF THE |
| | EPSS TO PERFORM IS LESS CRITICAL TO HUMAN LIFE AND |
| | SAFETY. |
| | 4.4.3 ALL EQUIPMENT SHALL BE PERMANENTLY INSTALLED. |
| | 4.4.4* LEVEL 1 AND LEVEL 2 SYSTEMS SHALL ENSURE THAT |
| | ALL LOADS |
| | SERVED BY THE EPSS ARE SUPPLIED WITH ALTERNATE POWER |
| | THAT |
| | MEETS ALL THE FOLLOWING CRITERIA: |
| | (1) OF A QUALITY WITHIN THE OPERATING LIMITS OF THE |
| | LOAD |
| | (2) FOR A DURATION SPECIFIED FOR THE CLASS AS DEFINED |
| | IN TABLE |
| | 4.1(A) |
| | (3) WITHIN THE TIME SPECIFIED FOR THE TYPE AS DEFINED |
| | IN TABLE |
| | 4.1(B) |
| | |
| | PLEASE REVIEW AND ENSURE COMPLIANCE. |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |