| Date |
Text |
| 2019-05-16 16:11:54 | PLUMBING 1ST REVIEW**DENIED** |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. |
| | |
| | 1) SHT P2 SHOW 2 (B) UNIT SPACES. I BELIEVE THIS SHOULD |
| | BE C? PLEASE CLARIFY. FBC 107.2.1 |
| | |
| | 2) PLEASE CLARIFY YOU INTENT IS TO HAVE A TANKLESS AT |
| | EACH SET OF SERVICE SINKS? SHT. P2 FLAT DRAWING DOES |
| | NOT SHOW HWH AT BAY'S B & E AND ALSO C & F NOT SHOWN ON |
| | THE WATER ISOMETRIC. FBC 107.3.5 |
| | |
| | 3) TANKLESS MODEL CALLED OUT IS A LOW FLOW MODEL(.5 GPM |
| | MAX) AND IS NOT CAPABLE OF PRODUCING HOT WATER AS |
| | REQUIRED FBC-PLB 607.1 @ THE MIN 3 GPM THE SERVICE SINK |
| | IS REQUIRED TO HAVE TO 1 SINK LET ALONG SUPPLING 2 |
| | SERVICE SINKS. FBC-PLB 604.3. HEATER SHALL BE SIZED SO |
| | AS TO PRODUCE HOT WATER 110F TO ALL FIXTURE IT SERVES |
| | AT FULL DEMAND. |
| | |
| | 4) SHT. A-5 SHALL SHOW THE MOUNTING OF THE GRAB BAR @ |
| | 36" TO THE TOP GRIPPING SURFACE AND NOT THE CENTER AS |
| | SHOWN. FBC-ACC 609.4 |
| | |
| | 5) SHT. A5 SHALL SHOW THE MOUNTING OF THE MIRROR @ 40" |
| | TO THE REFLECTIVE SURFACE AND NOT THE BOTTOM EDGE AS |
| | SHOWN. FBC-ACC 603.3 |
| | |
| | 6) SHT. P2 SHALL SHOW THE MOUNTING OF THE TOILET PAPER |
| | HOLDER 7"-9" FROM THE FRONT LIP OF THE TOILET EDGE. |
| | FBC-ACC 604.7 |
| | |
| | 7) SHT. A.03 PROVIDE THE TOILET CLEAR FLOOR SPACE IN |
| | BOTH RESTROOMS. FBC-ACC 604.3.1 |
| | |
| | 8) SHT. A.03 HAS THE REAR GRAB BAR ACROSS FROM THE |
| | TOILET ON THE MEN'S AND IS MISSING ALTOGETHER ON THE |
| | WOMENS. FBC-ACC 604.5.2 |
| | |
| | 9) IS THERE AN RPZ BACKFLOW DEVICE CURRENTLY PROTECTING |
| | THE CITY'S WATER SYSTEM AT THIS PROPERTY? FBC |
| | 107.2.1.IF NOT ONE WILL BE REQUIRED AND A SEPARATE |
| | PLUMBING BACKFLOW PERMIT APPLICATION SHALL BE |
| | SUBMITTED. WPB CROSS CONNECTION MANUAL 2017. CITY |
| | ORD.#2853-95. |
| | |
| | |
| | |
| | |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 1ST FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | 561-248-2703 |
| | [email protected] |
| | [email protected] |