Date Text
2019-05-14 11:04:581) SHT. A2.9 - ELEVATION #4 & #7 - THE HEIGHT OF THE
 LAVATORY SHALL BE A MAXIMUM OF 34 INCHES ABOVE THE
 FINISH FLOOR. A MINIMUM OF 27 INCHES 2017 FBC-ACCESS.
 SEC.606.3. THE ELEVATION APPEARS TO SHOW THE HEIGHT AS
 3 FEET ONE INCH. CLARIFY.
 2) SHT. A2.9 - ELEVATION #4 - THE FLUSH VALVE HANDLE
 SHALL BE LOCATED ON THE OPEN SIDE OF THE WATER CLOSET.
 2017 FBC-ACCESS. SEC. 604.6.
 3) SHT. A2.9 - ELEVATION #2 & #5 - KNEE AND TOE
 CLEARANCE SHALL COMPLY WITH 2017 FBC-ACCESS. SEC.306.2
 & 306.3. SHOW THESE ON THE ELEVATION.
 4) SHT. A2.9 - ELEVATION #4 & #7 - THE BOTTOM OF THE
 REFLECTIVE SURFACE FOR THE MIRROR SHALL BE A MAXIMUM OF
 40 INCHES ABOVE THE FFINISH FLOOR.
 5) SHT. A2.9 - ELEVATIONS # 3 & #6 - THE LOCATION OF
 THE TOILET PAPER DISPENSER SHALL COMPLY WITH 2017
 FBC-ACCESS. SEC. 604.7.
 6) SHT. A2.9 - ELEVATIONS #4 & #7 - WHERE LAVATORIES
 ARE PROVIDED, AT LEAST ONE SHALL COMPLY WITH 2017 FBC-
 ACCESS. SEC. 606 AND SHALL NOT BE LOCATEDD INSIDE A
 TOILET COMPARTMENT. 2017 FBC-ACCESS. SEC.213.3.4.
 7) SHT. A2.9 - THE LOCATION OFF THE GRAB BARS SHALL
 COMPLY WITH 2017 FBC-ACCESS. SECS. 604.5, 604.5.1,
 604.5.2.
 8) SHT. A2.9 - DETAIL #1 - THE ACCESSIBLE WATER CLOSETS
 SHALL BE LOCATED IN ACCORDANCE WITH 2017 FBC-ACCESS.
 SEC.604.2.
 9) THE HOT WATER PIPING AND RECIRCULATION PIPNG SHALL
 BE INSULATED IN ITS ENTIRETY PER THE 2017 FBC-ENERGY
 SEC. C404.4 & TABLE C403.2.10. INDICATE THE INSULATION
 THICKNESS FOR THE PIPE SIZES ON THE PLANS.
 10) A SAMPLING PORT MINIMUM 4 INCHES IN SIZE SHALL BE
 INSTALLED ON THE DISCHARGE LINE OF THE GREASE
 INTERCEPTOR. A TWO WAY CLEANOUT WILL SATISFY THIS
 REQUIREMENT.
 11) SHT. P3.1 - GAS RISER - SHOW THE BTU LOAD FOR GAS
 APPLIANCE UNIT #107.2. WPB AMEND. TO FBC SEC. 107.2.1.
 12) SHT. P3.1 - CLEANOUTS ARE REQUIRED IN THE BASE OF
 THE STACKS FOR THE SANITARY SYSTEM AND THE GREASY WASTE
 SYSTEM. 2017 FBC-PLUMBING SEC.708.5.1.
 13) SHT. P5.2 - WATER HEATER DETAIL - SHOW THE SIZE OF
 THE EXPANSION TANK ON THE PLANS. WPB AMEND. TO FBC SEC.
 107.2.1.
 14) SHT. P5.3 - THE CONCRETE GREASE INTERCEPTOR SHALL
 COMPLY WITH THE CITY OF WEST PALM BEACH ENGINEERING
 DEPT. STANDARD DRAWING FOR CCONCRETE GREASE
 INTERCEPTOS.
 15) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54,
 NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND
 301.3.GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC
 SEC.305.1.
 16) ) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE GAS
 APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL
 GAS SECS. 304.1, 304.9.3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved