Plan Review Notes
Plan Review Notes For Permit 19040512
Permit Number 19040512
Review Stop FIRE
Sequence Number 1
Notes
Date Text
2019-04-16 11:18:19THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THE PROPOSED INSTALLATION SHALL BE INCOMPLAINCE WITH
 NFPA 20 AND NFPA 37
  
 THERE IS NO CLEAR INDICATION OF WHERE THE EXHAUST
 SYSTEM WILL TERMINATE.
  
 PER NFPA 37
  
 8.2.3 EXHAUST SYSTEM TERMINATION.
 8.2.3.1* EXHAUST SYSTEMS SHALL TERMINATE OUTSIDE THE
 STRUCTURE
 AT A POINT WHERE HOT GASES, SPARKS, OR PRODUCTS OF
 COMBUSTION
 WILL DISCHARGE TO A SAFE LOCATION.
  
 PER NFPA 20
  
 11.5.3 EXHAUST DISCHARGE LOCATION.
  
 11.5.3.2 EXHAUST GASES SHALL NOT BE DISCHARGED WHERE
 THEY WILL
 AFFECT PERSONS OR ENDANGER BUILDINGS.
  
 PLEASE PROVIDE GREATER DETAIL FOR THE EXHAUST
 TERMINATION IN COMPLIANCE WITH THE CODES.
  
  
  
  
 2) THERE IS NO CLEAR INDICATIONS OF EXHAUST PIPING
 DETAILS
  
 NFPA 20
  
 11.5.2.2 A FLEXIBLE CONNECTION WITH A SECTION OF
 STAINLESS STEEL,
 SEAMLESS OR WELDED CORRUGATED (NOT INTERLOCKED), NOT
 LESS THAN
 12 IN. (305 MM) IN LENGTH SHALL BE MADE BETWEEN THE
 ENGINE
 EXHAUST OUTLET AND EXHAUST PIPE.
 11.5.2.3 THE EXHAUST PIPE SHALL NOT BE ANY SMALLER IN
 DIAMETER
 THAN THE ENGINE EXHAUST OUTLET AND SHALL BE AS SHORT AS
 POSSIBLE.
 11.5.2.4 THE EXHAUST PIPE SHALL BE COVERED WITH
 HIGHTEMPERATURE
 INSULATION OR OTHERWISE GUARDED TO PROTECT PERSONNEL
 FROM INJURY.
 11.5.2.5 THE EXHAUST PIPE AND MUFFLER, IF USED, SHALL
 BE SUITABLE
 FOR THE USE INTENDED, AND THE EXHAUST BACK PRESSURE
 SHALL
 NOT EXCEED THE ENGINE MANUFACTURER?S RECOMMENDATIONS.
 11.5.2.6 EXHAUST PIPES SHALL BE INSTALLED WITH
 CLEARANCES OF AT
 LEAST 9 IN. (229 MM) TO COMBUSTIBLE MATERIALS.
  
 PLEASE PROVIDE GREATER DETAIL FOR THE EXHAUST PIPING.
  
  
  
  
 3) THERE IS NO CLEAR INDICATION OF THE VENTILATION FOR
 THE NEW PUMP.
  
 NFPA 20
  
 11.3.2* VENTILATION.
 11.3.2.1 VENTILATION SHALL BE PROVIDED FOR THE
 FOLLOWING FUNCTIONS:
 (1) TO CONTROL THE MAXIMUM TEMPERATURE TO 120?F (49?C)
 AT
 THE COMBUSTION AIR CLEANER INLET WITH ENGINE RUNNING AT
 RATED LOAD
 (2) TO SUPPLY AIR FOR ENGINE COMBUSTION
 (3) TO REMOVE ANY HAZARDOUS VAPORS
 (4) TO SUPPLY AND EXHAUST AIR AS NECESSARY FOR RADIATOR
 COOLING
 OF THE ENGINE WHEN REQUIRED
 11.3.2.2 THE VENTILATION SYSTEM COMPONENTS SHALL BE
 COORDINATED
 WITH THE ENGINE OPERATION.
  
 PLEASE PROVIDE DETAILS FOR COMPLIANCE WITH THE CODE.
  
  
  
  
 4) THERE IS NO CLEAR INDICATIONS BONDING AND GROUNDING.
  
 NFPA 20
  
 11.4.6* STATIC ELECTRICITY.
 11.4.6.1 THE TANK, PUMP, AND PIPING SHALL BE DESIGNED
 AND
 OPERATED TO PREVENT ELECTROSTATIC IGNITIONS.
 11.4.6.2 THE TANK, PUMP, AND PIPING SHALL BE BONDED AND
 GROUNDED.
 11.4.6.3 THE BOND AND GROUND SHALL BE PHYSICALLY
 APPLIED OR
 SHALL BE INHERENTLY PRESENT BY THE NATURE OF THE
 INSTALLATION.
 11.4.6.4 ANY ELECTRICALLY ISOLATED SECTION OF METALLIC
 PIPING OR
 EQUIPMENT SHALL BE BONDED AND GROUNDED TO PREVENT
 HAZARDOUS
 ACCUMULATION OF STATIC ELECTRICITY.
  
 PLEASE PROVIDE DETAILS FOR EACH PIECE OF EQUIPMENT.
  
  
  
 5) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  