| Date |
Text |
| 2019-07-18 13:18:25 | 2ND REVIEW FBC-2017 MECHANICAL |
| | PERMIT #19040126 |
| | 7/18/19 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | THE FOLLOWING REVIEW COMMENTS ARE BASED ON REVIEW OF |
| | THE RESUBMITTED PLANS AND THE SUBMITTED NARRATIVE BY |
| | THE EOR DON PENN IN RESPONSE TO THE 1ST REVIEW |
| | COMMENTS. |
| | |
| | 1) M1.1: RECIRCULATION OF AIR FROM THE SALONS TO THE |
| | COMMON AREAS- ENTRY HALL, CORRIDORS, AND BREAKROOM IS |
| | PROHIBITED PER TABLE 403.3.1.1 FOOTNOTE B FBC M. |
| | |
| | 2) M1.3: PROVIDE THE SIZES OF THE MAIN EXHAUST DUCTS |
| | FROM THE SALONS TO THE ROOF FANS EF-3 & EF-4. |
| | |
| | 3) M1.3: PROVIDE THE SEQUENCES OF OPERATION FOR THE |
| | EF-3 & EF-4. IT APPEARS BY THE DESIGN THAT THE FANS |
| | WILL HAVE TO RUN CONTINOUSLY WHEN THE SALON IS OPEN. |
| | WILL THE FANS BE INTERLOCKED WITH THE AC OR LIGHTING |
| | SYSTEMS- SEE SECTION 501.4 FBC M. |
| | |
| | 4) M1.1: BASED ON THE SUBMITTED SPECIFICATIONS FOR THE |
| | DRYERS, MAKEUP AIR FOR EXHAUST IS REQUIRED. THE PLAN |
| | SHOWS AN EQUAL AMOUNT OF SUPPLY AND RETURN AIR IN THE |
| | ROOM. PLEASE NOTE THAT CFMS SHOWN IN THE AIR BALANCE |
| | SCHEDULE ON SHEET M1.3 DO NOT MATCH THE CFMS ON THE |
| | M1.1 PLAN. |
| | |
| | 5) M1.1 & M1.2: IN REFERENCE TO COMMENT #4 FROM THE 1ST |
| | REVIEW, PLEASE PROVIDE MANUFACTURER'S DATA SHEETS TO |
| | VERIFY THE 5-TON AC SYSTEMS CANNOT PRODUCE MORE 2000 |
| | CFMS OF SUPPLY AIR, OR PROVIDE THE DS DETECTORS. |
| | |
| | 6) M1.1: THE EXHAUST DETAIL APPEARS TO SHOW FLEX DUCTS |
| | BEING USED FOR TOILET EXHAUST, HOWEVER METAL DUCTWORK |
| | IS REQUIRED PER SMACNA HVAC CONSTRUCTION STANDARDS. |
| | |
| | 7) IN REFERENCE TO COMMENT #8 FROM THE 1ST REVIEW, THE |
| | REQUESTED AC CALCULATIONS WERE NOT PROVIDED, HOWEVER |
| | ENERGY CALCULATIONS WERE PROVIDED. |
| | |
| | 8) M1.2: IN REFERENCE TO COMMENT #9 FROM THE 1ST REVIEW |
| | THE REQUESTED WIND LOAD ENGINEERING HAS NOT BEEN |
| | COMPLETELY PROVIDED. A) NOTE #5 DOES NOT INDICATE THE |
| | TYPE AND SIZE OF SCREWS FOR ATTACHING THE RTU'S TO THE |
| | CURBS. B) STRUCTURAL DETAILS FOR ATTACHING THE CURBS TO |
| | THE ROOF STRUCTURE NOT PROVIDED. C) WIND DESIGN |
| | CRITERIA NOT PROVIDED. D) STRUCTURAL DETAILS AND/OR |
| | NOA'S FOR THE ROOFTOP PLANS NOT PROVIDED. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |