| Plan Review Notes For Permit 19030941 |
| Permit Number |
19030941 |
|
| Review Stop |
FIRE |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-08-07 14:50:44 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) PLEASE BE ADVISED, THAT THE COMMENT RESPONSE THAT | | | THIS INSTALLATION DOES NOT FALL UNDER NFPA 110, MAY NOT | | | BE ACCEPTED. | | | | | | PER NFPA 110 | | | | | | CHAPTER 1 ADMINISTRATION | | | 1.1 SCOPE. THIS STANDARD CONTAINS REQUIREMENTS COVERING | | | THE | | | PERFORMANCE OF EMERGENCY AND STANDBY POWER SYSTEMS | | | PROVIDING | | | AN ALTERNATE SOURCE OF ELECTRICAL POWER TO LOADS IN | | | BUILDINGS | | | AND FACILITIES IN THE EVENT THAT THE PRIMARY POWER | | | SOURCE | | | FAILS. | | | 1.1.1 POWER SYSTEMS COVERED IN THIS STANDARD INCLUDE | | | POWER | | | SOURCES, TRANSFER EQUIPMENT, CONTROLS, SUPERVISORY | | | EQUIPMENT, | | | AND ALL RELATED ELECTRICAL AND MECHANICAL AUXILIARY AND | | | ACCESSORY | | | EQUIPMENT NEEDED TO SUPPLY ELECTRICAL POWER TO THE LOAD | | | TERMINALS OF THE TRANSFER EQUIPMENT. | | | | | | THIS INSTALLATION APPEARS TO BE PROVIDING POWER TO THE | | | ENTIRE BUILDING AND SUBSEQUENTLY IS REQUIRED TO COMPLY | | | WITH THIS CODE. | | | | | | THE PREVIOUS COMMENTS REMAIN APPLICABLE; HOWEVER, THIS | | | PERMIT WAS PROVISO'D IN AN EFFORT TO NOT FURTHER DELAY | | | THIS PROJECT. | | | | | | PLEASE REVIEW AND ENSURE COMPLIANCE AS THIS IS HOW IT | | | WILL BE INSPECTED AND TESTED WITH. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|