| Date |
Text |
| 2019-04-05 13:00:06 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | FLORIDA BUILDING CODE 2017 6TH EDITION |
| | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED |
| | NFPA 70 2014 EDITION |
| | |
| | JAKE LEAHY |
| | ELECTRICAL PLANS EXAMINER II |
| | 561-805-6713 |
| | [email protected] |
| | |
| | 1) VALUE OF THE WORK SHOWN IS TOO LOW, PLEASE SUBMIT A |
| | BREAK DOWN OF ALL EQUIPMENT AND LABOR FOR THE TOTAL JOB |
| | INSTALATION. |
| | |
| | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO |
| | INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, |
| | INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND |
| | DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION |
| | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. FINAL |
| | BUILDING PERMIT VALUATION |
| | SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 2) PLANS SHOW TWO EXISTING GENERATORS STAYING OR DEMO? |
| | |
| | 3) CUT SHEETS FOR ALL EQUIPMENT INVOLVED WITH THIS |
| | INSTALLATION. |
| | |
| | 4) PAGE E-1.1 COLOR CODE FOR HIGH VOLTAGE NEEDS TO BE |
| | CHECKED WITH THE EXISTING AND IS TO MATCH EXISTING |
| | COLOR CODE USED IN THE BUILDING. |
| | |
| | 5) E-2 NEW FAULT CURRENT VALUES ARE SHOWN HOW WHERE |
| | THEY CALCULATED PLEASE SHOW. |
| | |
| | 6) ATS AND GENERATOR HAVE BREAKERS THAT CAN OR ARE SET |
| | AT 1200 AMPERES THEY SHALL MEET THE REQUIREMENTS 240.87 |
| | |
| | 240.87 ARC ENERGY REDUCTION |
| | WHERE THE HIGHEST CONTINUOUS CURRENT TRIP SETTING FOR |
| | WHICH THE ACTUAL OVERCURRENT DEVICE INSTALLED IN A |
| | CIRCUIT BREAKER IS RATED |
| | OR CAN BE ADJUSTED IS 1200 A OR HIGHER, 240.87(A) AND |
| | (B) SHALL APPLY. |
| | |
| | (A) DOCUMENTATION. DOCUMENTATION SHALL BE AVAILABLE TO |
| | THOSE AUTHORIZED TO DESIGN, INSTA LL, OPERATE, OR |
| | INSPECT THE INSTALLATION |
| | AS TO THE LOCATION OF THE CIRCUIT BREAKER(S). |
| | (B) METHOD TO REDUCE CLEARING TIME. ONE OF THE |
| | FOLLOWING OR APPROVED EQUIVALENT MEANS SH ALL BE |
| | PROVIDED: |
| | (1) ZONE-SELECTIVE INTERLOCKING |
| | (2) DIFFERENTIAL RELAYING |
| | (3) ENERGY-REDUCING MAINTENANCE SWITCHING WITH LOCAL |
| | STATUS INDICATOR |
| | (4) ENERGY-REDUCING ACTIVE ARC FLASH MITIGATION SYSTEM |
| | (5) AN APPROVED EQUIVALENT MEANS |
| | |
| | 7) PAGE E-6 WIRE SCHEDULE FOR #1 SHOWS 3-#10, 1-18-2 C, |
| | AND 1- CAT 5 PLEASE EXPLAIN. |
| | |
| | 8) PAGE E-7 SIGNS NEED TO HAVE ONE THAT MEETS 445.11. |
| | |
| | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN |
| | RESUBMITTING, IT IS HELPFUL TO |
| | PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG |
| | WITH THE CITY RESUBMITTAL FORM. ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO THE ORIGINAL |
| | SUBMITTAL AND REMOVE OR VOID THE PREVIOUSLY REVIEWED |
| | SHEETS. |