| 2019-03-22 07:18:47 | PLUMBING 1ST REVIEW**DENIED** |
| | |
| | 1) VALUE OF JOB IS LOW AND MUST INCLUDE THE COST OF ALL |
| | MATERIALS (TUB). PROVIDE A SIGNED BONA FIDE CONTRACT |
| | SHOW DETAIL COST OF ENTIRE PROJECT. 109.3 BUILDING |
| | PERMIT VALUATIONS. IF, IN THE OPINION OF THE BUILDING |
| | OFFICIAL, THE CLAIMED VALUATION OF BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR |
| | PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| | APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE |
| | APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| | BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| | MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 2) YOU PLAN SHOW EXISTING DRAIN AS LEFT HAND. WILL THE |
| | NEW TUB ALSO BE LEFT HAND AND NOT OFFSETINNG OF THE |
| | EXISTING DRAIN? FBC 107.2.1 |
| | |
| | |
| | TIM HUNT |
| | PLUMBING INSPECTOR/PLUMBING PLAN EXAMINER |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 561-248-2703 |
| | [email protected] |
| | |
| | |
| | |
| | |