Plan Review Notes
Plan Review Notes For Permit 19030936
Permit Number 19030936
Review Stop P
Sequence Number 1
Notes
Date Text
2019-03-22 07:18:47PLUMBING 1ST REVIEW**DENIED**
  
 1) VALUE OF JOB IS LOW AND MUST INCLUDE THE COST OF ALL
 MATERIALS (TUB). PROVIDE A SIGNED BONA FIDE CONTRACT
 SHOW DETAIL COST OF ENTIRE PROJECT. 109.3 BUILDING
 PERMIT VALUATIONS. IF, IN THE OPINION OF THE BUILDING
 OFFICIAL, THE CLAIMED VALUATION OF BUILDING,
 ALTERATION, STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR
 PLUMBING SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED, UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2) YOU PLAN SHOW EXISTING DRAIN AS LEFT HAND. WILL THE
 NEW TUB ALSO BE LEFT HAND AND NOT OFFSETINNG OF THE
 EXISTING DRAIN? FBC 107.2.1
  
  
 TIM HUNT
 PLUMBING INSPECTOR/PLUMBING PLAN EXAMINER
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 561-248-2703