| Date |
Text |
| 2019-04-30 10:23:30 | PLUMBING 2ND REVIEW**DENIED** |
| | |
| | FL ST 553.80 (B)2B WITH RESPECT TO EVALUATION OF DESIGN |
| | PROFESSIONALS? DOCUMENTS, IF A LOCAL GOVERNMENT FINDS |
| | IT NECESSARY, IN ORDER TO ENFORCE COMPLIANCE WITH THE |
| | FLORIDA BUILDING CODE AND ISSUE A PERMIT, TO REJECT |
| | DESIGN DOCUMENTS REQUIRED BY THE CODE THREE OR MORE |
| | TIMES FOR FAILURE TO CORRECT A CODE VIOLATION |
| | SPECIFICALLY AND CONTINUOUSLY NOTED IN EACH REJECTION, |
| | INCLUDING, BUT NOT LIMITED TO, EGRESS, FIRE PROTECTION, |
| | STRUCTURAL STABILITY, ENERGY, ACCESSIBILITY, LIGHTING, |
| | VENTILATION, ELECTRICAL, MECHANICAL, PLUMBING, AND GAS |
| | SYSTEMS, OR OTHER REQUIREMENTS IDENTIFIED BY RULE OF |
| | THE FLORIDA BUILDING COMMISSION ADOPTED PURSUANT TO |
| | CHAPTER 120, THE LOCAL GOVERNMENT SHALL IMPOSE, EACH |
| | TIME AFTER THE THIRD SUCH REVIEW THE PLANS ARE REJECTED |
| | FOR THAT CODE VIOLATION, A FEE OF FOUR TIMES THE AMOUNT |
| | OF THE PROPORTION OF THE PERMIT FEE ATTRIBUTED TO PLANS |
| | REVIEW. |
| | |
| | |
| | 1) ***ANSWERED WITH NEW COMMENT*I UNDERSTAND THAT |
| | PRECISION RENOVATIONS IS KNOW TAKING OVER THE ENTIRE |
| | PROJECT PER THE SIGNED CONTRACT SUBMITTED. A CHANGE OF |
| | CONTRACTOR FORM IS REQUIRED FOR ALL TRADES. |
| | |
| | 2) 2ND REQUEST: PROVIDE EXISTING FLOOR PLAN AS PER CITY |
| | RECORDS UNDER PERMIT # 17030482 AND INSPECTORS PHOTOS |
| | THERE IS SIGNIFICANT CHANGE TO THE FLOOR PLAN. FBC |
| | 107.3.5. OWNER PURCHASED HOME ON 7/16/18, YOU CONTRACT |
| | LIST YOUR FIRST SITE VISIT AS 10/1/18. THE FIELD |
| | INSPECTOR FOUND WORKERS ON-SITE WORKING. ANY AND ALL |
| | WORK UNPERMITTED WORK IS THE RESPONSIBILITY OF THE |
| | CURRENT OWNER. PROVIDE AN EXISTING FLOOR PLAN AND A |
| | PROPOSED FLOOR PLAN.FBC 107.3.5 |
| | |
| | 3) PROVIDE A COMPLETE SANITARY RISER ISOMETRIC SHOWING |
| | ALL NEW WORK. FBC 107.3.5 |
| | (A) CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND |
| | DRAWN UPON SUITABLE MATERIAL. RISER ISOMETRIC IS IN |
| | PENCIL.PENCIL IS NOT PERMITTED. FBC 107.2.1 |
| | (B) CONSTRUCTION DOCUMENTS SHALL BE SIGNED BY THE |
| | PERSON TAKING RESPONSIBILITY F.S 471, 481, 489 |
| | |
| | 4) PROVIDE SHOWER PAN DETAIL AND PRODUCT BEING USED. |
| | PROVIDE DRAWING OF PAN SHOWING PRE-PITCH @ 2% AND SHOW |
| | CURB HEIGHT. FBC 107.2.1 |
| | |
| | 5) 2ND REQUEST:EXPOSE ALL WORK REQUIRING INSPECTION. IT |
| | SHALL BE THE DUTY OF THE PERMIT APPLICANT TO CAUSE THE |
| | WORK TO REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION |
| | PURPOSES. WPB AMEND TO THE FBC 110.1 |
| | (A)PLEASE PROVIDE A NARRATIVE ON HOW YOU INTENT TO |
| | EXPOSE ALL COVERED WORK TO ALLOW THE CITY'S INSPECTION |
| | STAFF TO PROPERLY PERFORM THE REQUIRED INSPECTIONS FBC |
| | 110.1. |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 1ST FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | 561-248-2703 |
| | [email protected] |
| | |