| 2019-04-05 13:14:04 | PLUMBING 1ST REVIEW**DENIED** |
| | |
| | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD |
| | CALCULATION IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC |
| | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION |
| | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT |
| | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED |
| | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET |
| | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS |
| | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING |
| | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, |
| | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT |
| | THE PUMP. |
| | |
| | 2) PROVIDE MAIN DRAIN DETAIL SHOWINF G.P.M AND THAT |
| | THEY COMPLY WITH V.G.B. FBC R 4501.6.6, 4501.21.3 |
| | |
| | 3) VALUE SEEMS LOW. PROVIDE A SIGNED BONA FIDE |
| | CONTRACT.109.3 BUILDING PERMIT VALUATIONS. IF, IN THE |
| | OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| | OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, |
| | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS |
| | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE |
| | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION |
| | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT |
| | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, |
| | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, |
| | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR |
| | CITY OF WEST PALM BEACH |
| | 561-248-2703 |
| | [email protected] |
| | [email protected] |
| | |
| | |