| Date |
Text |
| 2019-07-12 12:38:08 | 2ND REVIEW FBC-2017 MECHANICAL |
| | PERMIT #19030147 |
| | 7/12/19 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE O/A DUCTS THAT ARE PENETRATING THE FIRE-RATED |
| | FLOOR/CEILING ASSEMBLIES AT EACH LEVEL SHALL BE |
| | ENCLOSED IN FIRE-RATED SHAFTS PER SECTION 607.6, OR |
| | SHALL BE PROTECTED WITH LISTED CEILING RADIATION |
| | DAMPERS AT ECH FLOOR/CEILING PENETRATION. |
| | |
| | 2) THE PLANS INDICATE DOOR UNDERCUTS FOR REQUIRED |
| | MAKEUP AIR FOR TRASH AND LAUNDRY ROOM EXHAUST SYSTEMS. |
| | PLEASE NOTE THAT THESE ROOMS ARE FIRE-RATED AND THE |
| | DOORS INTO THEM ARE FIRE-RATED. DOOR UNDERCUTS ON |
| | FIRE-RATED DOORS ARE NOT PERMITTED ON LABELED DOORS- |
| | SECTION 716.5.1 FBC B AND SECTION 1.3.4 NFPA 252. |
| | MAKEUP AIR IN THESE ROOMS MUST BE PROVIDED BY DUCTS OR |
| | TRANSFER GRILLS- SECTION 504.6. THWE LAUNDRY ROOM PLANS |
| | SHALL SHOW THE LOCATIONS AND NUMBER OF DRYERS TO BE |
| | INSTALLED- SECTION 107.2.1 WPB. |
| | |
| | 3) COMMENT #3 FROM THE 1ST REVIEW STILL EXISTS. SHEET |
| | M3.1: PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION OF |
| | THE EXTERIOR CHILLERS, BOILERS, STORAGE TANKS, |
| | GENERATOR, AND THE ROOFTOP O/A INTAKES, EXHAUST |
| | OUTLETS, AND ELEVATOR RELIEF HOOD- SECTION 301.15 FBC |
| | M. PLEASE NOTE THAT THE PLANS SHOW A FIRE PUMP |
| | ENCLOSURE. IS THIS A MANUFACTURED PRODUCT, OR AN |
| | ENCLOSURE TO BE CONSTRUCTED ON-SITE? IF THIS IS A |
| | MANUFACTURED PRODUCT IT MUST EITHER HAVE FL. |
| | MANUFACTURED BUILDING APPROVAL OR FLORIDA PRODUCT |
| | APPROVAL- RULE 9N-3 FAC. TO BE CONSTRUCTED ON-SITE, |
| | PLEASE PROVIDE COMPLETE STRUCTURAL DRAWINGS AND |
| | DETAILS. PLEASE SEE SECTION 4.13 NFPA 20 FOR OTHER |
| | COMPLIANCE REQUIREMENTS. |
| | |
| | 4) COMMENT #5 BELOW LISTED FOR REFERENCE |
| | |
| | 5) REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP |
| | DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME |
| | OF INSPECTION. |
| | A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS. |
| | B) MOTORIZED O/A DAMPERS |
| | C) DUCT SMOKE DETECTORS |
| | D) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES |
| | INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT |
| | APPROVALS AND/OR MIAMI-DADE NOA'S |
| | E) AC STAND NOA'S OR FL. PRODUCT APPROVALS |
| | F) CHILLERS |
| | G) CLOTHES DRYERS |
| | H) COOKING APPLIANCES |
| | I) TEST AND BALANCE REPORTS |
| | |
| | SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT |
| | FOR REVIEW. |
| | A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR |
| | INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND |
| | APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR |
| | DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE |
| | TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED |
| | ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE |
| | STRUCTURAL ENGINEER RECORD. |
| | B) GENERATOR |
| | C) BOILERS AND WATER HEATERS INCLUDING VENT FLUES |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | CCOLE |
| | |