| 2019-05-14 13:06:44 | DYLAN BATTLES |
| | BUILDING PLANS EXAMINER PX4191 |
| | [email protected] |
| | 561-805-6718 |
| | |
| | F.S. 553.79(5) THRESHOLD BUILDING. |
| | THIS PROJECT MEETS THE DEFINITION OF A THRESHOLD |
| | BUILDING. THE FOLLOWING IS REQUIRED PRIOR TO |
| | COMMENCEMENT. |
| | |
| | A. COMPLETE THE THRESHOLD / SPECIAL INSPECTOR AGREEMENT |
| | OF UNDERSTANDING; THIS HAS BEEN SENT VIA EMAIL TO |
| | CONTRACTOR. IF PDF OF AGREEMENT IS NEEDED PLEASE |
| | CONTACT THE BUILDING PLAN REVIEWER AND THEY WILL |
| | PROVIDE VIA E-MAIL. |
| | OK-AGREEMENT SENT TO DESIGNER BY PLANS EXAMINER DYLAN |
| | BATTLES ON 5/14/2019 |
| | |
| | B. PROVIDE RESUMES AND COPIES OF LICENSES FOR ALL |
| | PROPOSED INSPECTORS. PLEASE INCLUDE AS MANY ADDITIONAL |
| | INSPECTORS AS POSSIBLE BECAUSE THESE ARE THE ONLY |
| | PEOPLE THAT THE CHIEF BUILDING INSPECTOR WILL ALLOW TO |
| | BE ON-SITE. UPON COMPLETION OF AGREEMENT PLEASE E-MAIL |
| | TO [email protected] WITH RESUMES FOR ALL PARTIES LISTED |
| | ON THE AGREEMENT. UPON REVIEW AND ACCEPTANCE BY THE |
| | CHIEF INSPECTOR THE CITY WILL REQUEST THREE ORIGINAL |
| | COPIES OF THE AGREEMENT. |
| | |
| | C. ALL PLANS ARE TO INCLUDE THE THRESHOLD STATEMENT |
| | REQUIRED BY FS553.79(7)(D). ?ALL PLANS FOR THE BUILDING |
| | WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY THE |
| | ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT |
| | THAT, TO THE BEST OF THE ARCHITECT?S OR ENGINEER?S |
| | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE |
| | APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE |
| | FIRE SAFETY STANDARDS AS DETERMINED BY THE LOCAL |
| | AUTHORITY IN ACCORDANCE WITH THIS CHAPTER 553 AND |
| | CHAPTER 633.? |
| | |
| | THE STATEMENT ABOVE SHOULD BE ADDED TO ALL STRUCTURAL |
| | SHEETS. THIS CAN BE IN THE TITLE BLOCK OR OTHER |
| | LOCATION. SINCE THE STRUCTURAL SHEETS ALSO NEED GRAPHIC |
| | REPRESENTATION OF SEAL (SEE SIGNATURE REVIEW) ALL |
| | STRUCTURAL SHEETS SHOULD BE RE-UPLOADED. |
| | |
| | D. THRESHOLD INSPECTION PLAN REQUIRED, FS553.79(5)A). |
| | OK-INSPECTION PLAN FOUND ON SHEET 043 S0.1-NO RESPONSE |
| | NEEDED FOR THRESHOLD PLAN |
| | |
| | |
| | |