| 2019-03-05 15:42:36 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) SHEET LS 1 - THERE ARE INCORRECT EDITIONS TO THE |
| | ADOPTED FLORIDA FIRE PREVENTION CODE, NFPA 220 AND 101B |
| | ARE NOT ADOPTED NOR APPLICABLE FOR THIS REVIEW. |
| | |
| | PROPOSED PROJECTS SHALL MEET THE REQUIREMENTS OF THE |
| | 6TH EDITION OF FLORIDA FIRE PREVENTION CODE WHICH |
| | INCLUDES THE 2015 EDITION OF NFPA 1 AND NFPA 101. |
| | |
| | THE BELOW LIST ARE THE MOST COMMON REFERENCED CODES: |
| | |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2013 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2013 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2013 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2013 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2014 EDITION. |
| | |
| | PLEASE REVIEW AND ENSURE COMPLIANCE AND ADJUST YOUR |
| | RECORDS. |
| | |
| | SHOULD REVISIONS BE NECESSARY PLEASE REVISE WHERE |
| | APPLICABLE. |
| | |
| | |
| | |
| | 2) ANY AND ALL WORK ON THE FIRE ALARM AND/OR FIRE |
| | SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP |
| | DRAWINGS. |
| | |
| | |
| | |
| | 3) THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE |
| | SPRINKLER SHALL BE MAINTAINED AND REMAIN ACTIVE |
| | THROUGHOUT THE CONSTRUCTION PERIOD. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | WEST PALM BEACH FIRE RESCUE |
| | 561-804-4709 |
| | [email protected] |
| | |