2019-04-04 10:14:20FAILED
  
 PROVIDE WRITTEN RESPONSE TO COMMENTS.
  
 1) THE FUNCTION OF SPACE DIAGRAM PROVIDED WITH THE
 PERMIT DOES NOT MATCH THE FUNCTION OF SPACE DIAGRAM
 PROVIDED WITH THE PLANS APPROVED BY THE CITY
 COMMISSION. THE BUILDING PERMIT PLANS SHOW
 SIGNIFICANTLY MORE AREA AS ASSEMBLY INSTEAD OF STORAGE,
 WHICH WILL MAKE THE SITE DEFICIENT FOR PARKING.
  
 2) THE PLANS APPROVED BY THE CITY COMMISSION AND THE
 PLANS PROVIDED WITH THE PERMIT SHOW DIFFERING
 CONDITIONS (EX: SITE PLAN - TWO ADA PARKING SPACES
 SERVING THE GRACE PAVILION ARE IN DIFFERENT LOCATION.
 ELEVATIONS ? NEW DOOR ON THE EAST ELEVATION). PRIOR TO
 THE FINAL INSPECTION FOR THE ADOPTION CENTER, SUBMIT A
 MINOR PLANNED DEVELOPMENT AMENDMENT TO THE PLANNING
 DIVISION SHOWING THE ALL CHANGES TO THE APPROVED PLANS
 THAT HAVE BEEN APPROVED AS PART OF THE BUILDING PERMIT
 REVIEW PROCESS.
  
 3) PROVIDE VERIFICATION ON HOW THE ROOFTOP MECHANICAL
 EQUIPMENT, TO INCLUDE THE CONDENSING UNITS, WILL BE
 SCREENED FROM VIEW OF THE RESIDENTIAL PROPERTY TO THE
 NORTH AND EAST OF THE SITE AND THE PUBLIC
 RIGHTS-OF-WAY.
  
 4) THE ELECTRICAL SITE PLAN CALLS OUT A NEW FPL POLE.
 THE DEVELOPMENT REGULATIONS FOR THE PEGGY ADAMS CSPD
 REQUIRE THAT ALL NEW UTILITY LINES BE BURIED
 UNDERGROUND, WHICH DOES NOT PERMIT THE USE OF NEW
 UTILITY POLES ON THE SITE.
  
 5) SEPARATE PERMITS, WITH PLANS, ARE REQUIRED FOR:
 A. ANY PARKING LOT STRIPING
 B. BICYCLE RACKS
 C. TEMPORARY TRAILERS
 D. WALLS AND FENCES
 E. SIGNS
 F. TRELLIS
 G. SITE LIGHTING.
 H. THE REVISED DRIVEWAY CONNECTION TO MILITARY TRAIL.
  
 6) PLEASE NOTE THAT 004 SHEET SP-2 TEMPORARY TRAILERS &
 SITE DETAILS WAS REMOVED FROM SUBMITTAL AS ALL ITEMS ON
 THIS SHEET REQUIRE SEPARATE PERMITS.
  
 7) PLEASE NOTE THAT 044 SHEET A1.2 FENCES SIDE DETAILS
 WAS REMOVED FROM SUBMITTAL AS ALL ITEMS ON THIS SHEET
 REQUIRE SEPARATE PERMITS.
  
 8) AS PART OF THE PERMIT FOR THE REVISED DRIVEWAY
 CONNECTION TO MILITARY TRAIL, PROVIDE A COPY OF THE
 FDOT DRIVEWAY CONNECTION APPROVAL. PRIOR TO THE CITY'S
 FINAL INSPECTION, YOU WILL NEED TO PROVIDE THE CITY
 WITH A COPY OF THE FDOT ACCEPTANCE OF THE DRIVEWAY
 MODIFICATIONS TO MILITARY TRAIL.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.