| Date |
Text |
| 2019-04-09 14:09:23 | GAS 1ST REVIEW**DENIED |
| | |
| | 1) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. |
| | |
| | 2) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| | FBC-FUEL GAS SEC.402.4.1, 402.4.2 |
| | |
| | 3) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE, |
| | TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING |
| | DETAILS OF THE GAS VENT(S) PER 2017 FBC-FUEL GAS SECS. |
| | 502 THRU 505 |
| | |
| | 4) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58. GAS |
| | APPLIANCES SHALL BE LISTED AND LABELED. INSTALLATION |
| | MANUAL SHALL CALL OUT THAT THE APPLIANCE IS ABLE TO RUN |
| | @ 15" W.C. |
| | |
| | 5) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| | APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| | BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| | SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| | ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL |
| | GAS SEC.304.9.3 |
| | |
| | 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2014 FGC SEC.410.1 OR SHOW THAT EQUIPMENT |
| | IS ABLE TO RUN AT 15" W.C. |
| | |
| | 7) WHAT FUEL IS POWERING THE GENERATOR? FBC 107.2.1 |
| | |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER |
| | BUILDING DIVISION |
| | CITY OF WEST PALM BEACH |
| | 401 CLEMATIS STREET, 1ST FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | 561-248-2703 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |