Date Text
2021-05-26 16:30:59FAILED
  
 1) SHEET T1 LISTS THE SCOPE OF WORK INCLUDES THE
 INSTALLATION OF AN ENCLOSURE CABINET. NONE OF THE PLANS
 SHOW AN ENCLOSURE CABINET. PLEASE CLARIFY WHAT THIS
 MEANS. THE CITY DOES NOT PERMIT FREESTANDING OR POLE
 MOUNTED CABINETS.
  
 2) THE POLE HEIGHT AND STEALTH DESIGN MEET CITY
 STANDARDS. THE POLE COLOR IS TO MATCH THE EXISTING
 DECORATIVE CITY LIGHT POLES (SPECKLED BLACK) LOCATED
 ALONG FERN STREET.
  
 3) THE PLANTERS THAT ARE SHOWN ON THE SURVEY AND
 ENGINEERING PLANS ARE SURROUNDED BY A STRUCTURAL SOIL
 SYSTEM THAT IS NOT PERMITTED TO BE DISTURBED BY THE
 INSTALLATION OF THE PROPOSED POLE, GROUND RODS,
 FIBER/POWER PULL BOX AND UNDERGROUND ELECTRIC, SO THE
 CURRENT LOCATION IS NOT APPROVED. THE FULL AREA COVERED
 BY THE STRUCTURAL SOIL UNDER THE SIDEWALK IS A MINIMUM
 OF 19 FEET EAST TO WEST AND THE FULL DEPTH OF THE
 SIDEWALK FROM THE CURB TO THE EDGE OF THE RIGHT-OF-WAY
 LINE. NO EXCAVATION OR INSTALLATION MAY OCCUR CLOSER
 THAN SEVEN (7) FEET FROM A PARALLEL LINE WITH THE OUTER
 EDGES OF THE PLANTER WALLS, FROM THE CURB FACE TO THE
 RIGHT-OF-WAY LINE.
  
 4) THERE ARE APPROXIMATELY 10 FEET BETWEEN THE PARALLEL
 LINES MENTIONED IN THE PREVIOUS COMMENT, WHICH PROVIDES
 ADEQUATE ROOM TO INSTALL THE POLE AND THE PULL BOX;
 HOWEVER, STAFF DOES NOT KNOW WHAT THE GROUND ROD
 REQUIREMENTS ARE AND IF THERE IS AN ABILITY TO FIT THEM
 INTO THE AREA AS WELL (IT APPEARS CLOSE WITH THE
 CONFIGURATION AS SHOWN). THIS FINAL LAYOUT IN THIS AREA
 MUST BE PROVIDED ON A BLOW UP INSET WITH DIMENSIONS.
  
 5) STAFF CAN PROVIDE THE ENGINEERING DRAWINGS SHOWING A
 DETAIL FOR THE BIOSWALE PIT WITH THE SURROUNDING
 STRUCTURAL SOIL IF YOU NEED IT.
  
 6) THE STEALTH POLE SHOWN ON SHEET C3, ELEVATION AND
 EQUIPMENT PLAN, HAS A 14-INCH DIAMETER. SCALING THE
 POLE ON THE SURVEY AND SITE PLAN SHOW A SEVEN (7) INCH
 DIAMETER POLE. THE SURVEY AND SITE PLAN NEED TO SHOW
 THE CORRECT POLE SIZE AND DIMENSIONS FROM THE VARIOUS
 FEATURES SHOWN.
  
 7) THE POLE NEEDS TO BE PUSHED AS CLOSE TO THE CURB AS
 POSSIBLE GIVEN THE OVERHEAD WIRE IN ORDER TO MAINTAIN
 AS MUCH OF A STREET FURNITURE RHYTHM AS POSSIBLE AND TO
 MAINTAIN A UNIFORM SIDEWALK WIDTH BEHIND THE PLANTERS.
  
 8) THE UTILITY POWER PLAN WAS NOT INCLUDED THAT SHOWS
 HOW THE UNDERGROUND POWER IS BEING PROVIDED TO THE
 POLE. THE UNDERGROUND POWER PATH, INCLUDING ANY BORE
 PITS AND HANDHOLES ARE REQUIRED TO BE SHOWN ON THE
 WIRELESS COMMUNICATION FACILITY ROW PERMIT APPLICATION.
 REMEMBER, THE POWER PATH MAY NOT DISTURB THE STRUCTURAL
 SOIL SYSTEM.
  
 9) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED
 SURVEYOR, SHOWING THE RIGHT-OF-WAY LINE AND THE EDGE OF
 THE SIDEWALK, WITH DIMENSIONS FOR THE UNDERGROUND POWER
 ROUTE SO THAT STAFF CAN VERIFY THAT IT IS WITHIN A
 RIGHT-OR-WAY AND DOES NOT CONFLICT WITH ANY UNDERGROUND
 FACILITIES, INCLUDING LANDSCAPE ROOT AREAS.
  
 10) THE ENGINEERING PLAN (UTILITY POWER PLAN) NEEDS TO
 SHOW THE RIGHT-OF-WAY LINE (BASED ON THE SURVEY) AND
 CLEARLY DEMONSTRATE THAT THE HANDHOLES, BORE PITS AND
 UNDERGROUND POWER BORE ARE COMPLETELY LOCATED WITHIN
 THE RIGHT-OF-WAY AS WELL AS AVOIDING THE STRUCTURAL
 SOIL SYSTEM.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446