| 2021-05-26 16:30:59 | FAILED |
| | |
| | 1) SHEET T1 LISTS THE SCOPE OF WORK INCLUDES THE |
| | INSTALLATION OF AN ENCLOSURE CABINET. NONE OF THE PLANS |
| | SHOW AN ENCLOSURE CABINET. PLEASE CLARIFY WHAT THIS |
| | MEANS. THE CITY DOES NOT PERMIT FREESTANDING OR POLE |
| | MOUNTED CABINETS. |
| | |
| | 2) THE POLE HEIGHT AND STEALTH DESIGN MEET CITY |
| | STANDARDS. THE POLE COLOR IS TO MATCH THE EXISTING |
| | DECORATIVE CITY LIGHT POLES (SPECKLED BLACK) LOCATED |
| | ALONG FERN STREET. |
| | |
| | 3) THE PLANTERS THAT ARE SHOWN ON THE SURVEY AND |
| | ENGINEERING PLANS ARE SURROUNDED BY A STRUCTURAL SOIL |
| | SYSTEM THAT IS NOT PERMITTED TO BE DISTURBED BY THE |
| | INSTALLATION OF THE PROPOSED POLE, GROUND RODS, |
| | FIBER/POWER PULL BOX AND UNDERGROUND ELECTRIC, SO THE |
| | CURRENT LOCATION IS NOT APPROVED. THE FULL AREA COVERED |
| | BY THE STRUCTURAL SOIL UNDER THE SIDEWALK IS A MINIMUM |
| | OF 19 FEET EAST TO WEST AND THE FULL DEPTH OF THE |
| | SIDEWALK FROM THE CURB TO THE EDGE OF THE RIGHT-OF-WAY |
| | LINE. NO EXCAVATION OR INSTALLATION MAY OCCUR CLOSER |
| | THAN SEVEN (7) FEET FROM A PARALLEL LINE WITH THE OUTER |
| | EDGES OF THE PLANTER WALLS, FROM THE CURB FACE TO THE |
| | RIGHT-OF-WAY LINE. |
| | |
| | 4) THERE ARE APPROXIMATELY 10 FEET BETWEEN THE PARALLEL |
| | LINES MENTIONED IN THE PREVIOUS COMMENT, WHICH PROVIDES |
| | ADEQUATE ROOM TO INSTALL THE POLE AND THE PULL BOX; |
| | HOWEVER, STAFF DOES NOT KNOW WHAT THE GROUND ROD |
| | REQUIREMENTS ARE AND IF THERE IS AN ABILITY TO FIT THEM |
| | INTO THE AREA AS WELL (IT APPEARS CLOSE WITH THE |
| | CONFIGURATION AS SHOWN). THIS FINAL LAYOUT IN THIS AREA |
| | MUST BE PROVIDED ON A BLOW UP INSET WITH DIMENSIONS. |
| | |
| | 5) STAFF CAN PROVIDE THE ENGINEERING DRAWINGS SHOWING A |
| | DETAIL FOR THE BIOSWALE PIT WITH THE SURROUNDING |
| | STRUCTURAL SOIL IF YOU NEED IT. |
| | |
| | 6) THE STEALTH POLE SHOWN ON SHEET C3, ELEVATION AND |
| | EQUIPMENT PLAN, HAS A 14-INCH DIAMETER. SCALING THE |
| | POLE ON THE SURVEY AND SITE PLAN SHOW A SEVEN (7) INCH |
| | DIAMETER POLE. THE SURVEY AND SITE PLAN NEED TO SHOW |
| | THE CORRECT POLE SIZE AND DIMENSIONS FROM THE VARIOUS |
| | FEATURES SHOWN. |
| | |
| | 7) THE POLE NEEDS TO BE PUSHED AS CLOSE TO THE CURB AS |
| | POSSIBLE GIVEN THE OVERHEAD WIRE IN ORDER TO MAINTAIN |
| | AS MUCH OF A STREET FURNITURE RHYTHM AS POSSIBLE AND TO |
| | MAINTAIN A UNIFORM SIDEWALK WIDTH BEHIND THE PLANTERS. |
| | |
| | 8) THE UTILITY POWER PLAN WAS NOT INCLUDED THAT SHOWS |
| | HOW THE UNDERGROUND POWER IS BEING PROVIDED TO THE |
| | POLE. THE UNDERGROUND POWER PATH, INCLUDING ANY BORE |
| | PITS AND HANDHOLES ARE REQUIRED TO BE SHOWN ON THE |
| | WIRELESS COMMUNICATION FACILITY ROW PERMIT APPLICATION. |
| | REMEMBER, THE POWER PATH MAY NOT DISTURB THE STRUCTURAL |
| | SOIL SYSTEM. |
| | |
| | 9) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED |
| | SURVEYOR, SHOWING THE RIGHT-OF-WAY LINE AND THE EDGE OF |
| | THE SIDEWALK, WITH DIMENSIONS FOR THE UNDERGROUND POWER |
| | ROUTE SO THAT STAFF CAN VERIFY THAT IT IS WITHIN A |
| | RIGHT-OR-WAY AND DOES NOT CONFLICT WITH ANY UNDERGROUND |
| | FACILITIES, INCLUDING LANDSCAPE ROOT AREAS. |
| | |
| | 10) THE ENGINEERING PLAN (UTILITY POWER PLAN) NEEDS TO |
| | SHOW THE RIGHT-OF-WAY LINE (BASED ON THE SURVEY) AND |
| | CLEARLY DEMONSTRATE THAT THE HANDHOLES, BORE PITS AND |
| | UNDERGROUND POWER BORE ARE COMPLETELY LOCATED WITHIN |
| | THE RIGHT-OF-WAY AS WELL AS AVOIDING THE STRUCTURAL |
| | SOIL SYSTEM. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |