| Date |
Text |
| 2019-03-12 17:34:21 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #19020657 |
| | 3/12/19 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) M101 & M102: REFER TO TABLE 7-1 ASHRAE 170-2008 AND |
| | PROVIDE A DESIGN PARAMETERS (PRESSURE RELATIONSHIPS |
| | ETC.) SCHEDULE FOR THE ROOMS AND SPACES IN THE WORK |
| | AREAS. I AM NOT SEEING A "PHARMACY" ON THE PLANS. IS |
| | THIS A GENERAL TERM FOR THE WORK AREA OR DOES IT REFER |
| | TO A SPECIFIC ROOM OR SPACE? - SECTION 107.2.1 WPB. |
| | |
| | 2) SHEETS A102 & M102: THE LOCATIONS OF THE HAZARDOUS |
| | IV PREP AND NON-HAZARDOUS PREP IV ON THE MECHANICAL |
| | PLAN DO NOT MATCH THE LOCATIONS ON THE ARCHITECTURAL |
| | PLAN- SECTION 107.2.1 WPB. |
| | |
| | 3) M102, NOTE #3: THE HAZARDOUS EXHAUST DUCT FROM THE |
| | LAB HOOD SHALL BE INDEPENDENT OF THE OTHER EXHAUST |
| | SYSTEMS- SECTION 510.4 FBC M. A) THE HAZARDOUS EXHAUST |
| | DUCT SHALL EXTEND DIRECTLY TO THE EXTERIOR OF THE |
| | BUILDING AND SHALL NOT EXTEND INTO OR THROUGH DUCTS AND |
| | PLENUMS- SECTION 510.6.7 FBC M. B) REFER TO SECTION |
| | 510.9 AND INDICATE THE TYPE OF LAB HOOD EXHAUST DUCT |
| | |
| | TO BE INSTALLED. C) PROVIDE AN EQUIPMENT SCHEDULE FOR |
| | THE LAB HOOD AND SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | WITH A SPEC SHEET STAMPED BY THE ENGINEER OF RECORD- |
| | SECTION 304.1 FBC M. |
| | |
| | 4) REFER TO SECTION 414.1.3 FBC B: PROVIDE A HAZARDOUS |
| | MATERIALS REPORT THAT INCLUDES MATERIAL QUANTITIES, AND |
| | SUBMIT MSDS SHEETS FOR ALL MATERIALS TO BE STORED OR |
| | PROCESSED IN THE HAZARDOUS IV PREP ROOM AND ALL OTHER |
| | ROOMS AND SPACES. |
| | |
| | 5) M102: WHAT IS THE PURPOSE OF THE EXHAUST SYSTEM IN |
| | THE UNPACK ROOM- SEE TABLE 7-1 ASHRAE 170-2008 AND |
| | INCLUDE THE ROOM IN THE DESIGN PARAMETERS SCHEDULE. |
| | |
| | 6) M102: THE PLAN APPEARS TO SHOW THE RETURN DUCTS IN |
| | THE HAZADOUS AND NON-HAZARDOUS ROOMS CONNECTING INTO |
| | THE SUPPLY DUCT TO THE FFU'S- PLEASE CLARIFY |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| | PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| | KEEP THEM WITH THE SUBMITTALS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |