2019-07-17 11:37:13 
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 2ND BUILDING REVIEW APPROVED WITH PROVISOS:
  
 1. THE CONTRACTORS NEED TO BE DETERMINED FOR THIS
 PERMIT APPLICATION, DEMOLITION APPLICATION, AND ALL
 OTHER RELATED PERMIT APPLICATIONS.
  
 2. - 5. PLEASE PROVIDE: ALL DIGITALLY SUBMITTED
 DOCUMENTATION, INCLUDING PLANS, CALCULATIONS, AND
 SPECIFICATIONS NEED TO BE DIGITALLY SIGNED AND SEALED;
 SEE SIGNATURES STOP.
  
 6A. SEPERATE PERMITS ARE REQUIRED TO BE OBTAINED FOR
 DEMOLITION, DUMPSTER ENCLOSURE, CANOPY STRUCTURE,
 UNDERGROUND TANKS, ASSOCIATED PIPING, PUMPS, AND
 VENTING. WITHIN THE UNDERGROUND TANK PERMIT PROVIDE THE
 PALM BEACH COUNTY ERM APPROVAL.
  
 6B. PROVIDE A STANDARD CONSTRUCTION SCHEDULE SHOWING
 THE CANOPY FOOTINGS WILL NOT BE INSTALLED UNTIL AFTER
 THE TANK PIT IS BACK-FILLED.
  
 7. - 16. PLEASE PROVIDE: ALL DIGITALLY SUBMITTED
 DOCUMENTATION INCLUDING PLANS AND SPECIFICATIONS NEEDS
 TO BE DIGITALLY SIGNED AND SEALED; SEE SIGNATURES STOP.
  
 17. - 21. ALL SUBMITTED AND DEFERRED SUBMITTALS
 INCLUDING PRODUCT APPROVALS SHALL BE SUBMITTED TO THE
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL
 REVIEW THEM AND FORWARD THEM TO TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS
 HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. DEFERRAL OF
 ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE DEFERRED SUBMITTAL ITEMS
 SHALL NOT BE INSTALLED UNTIL THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE
 BEEN APPROVED BY THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
  
 22. PLEASE PROVIDE ROOFING SUB-PERMIT PRIOR TO ROOF
 WORK.
  
 23. PLEASE BE ADVISED THAT REGARDING THE STRUCTURAL
 STEEL CONNECTIONS (WELDING & BOLTING) A THIRD PARTY
 ENGINEER IS TO COMPLETE THE INSPECTIONS AND AT TIME OF
 INSPECTION PROVIDE FROM CONTRACTOR THE WELD PROCEDURE
 SPECIFICATION AND WELDER PERFORMANCE QUALIFICATION
 RECORDS.
  
  
  
  
  
  