| Date |
Text |
| 2019-07-17 11:37:13 | |
| | PETER E VALENTI |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6673 |
| | |
| | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | 2ND BUILDING REVIEW APPROVED WITH PROVISOS: |
| | |
| | 1. THE CONTRACTORS NEED TO BE DETERMINED FOR THIS |
| | PERMIT APPLICATION, DEMOLITION APPLICATION, AND ALL |
| | OTHER RELATED PERMIT APPLICATIONS. |
| | |
| | 2. - 5. PLEASE PROVIDE: ALL DIGITALLY SUBMITTED |
| | DOCUMENTATION, INCLUDING PLANS, CALCULATIONS, AND |
| | SPECIFICATIONS NEED TO BE DIGITALLY SIGNED AND SEALED; |
| | SEE SIGNATURES STOP. |
| | |
| | 6A. SEPERATE PERMITS ARE REQUIRED TO BE OBTAINED FOR |
| | DEMOLITION, DUMPSTER ENCLOSURE, CANOPY STRUCTURE, |
| | UNDERGROUND TANKS, ASSOCIATED PIPING, PUMPS, AND |
| | VENTING. WITHIN THE UNDERGROUND TANK PERMIT PROVIDE THE |
| | PALM BEACH COUNTY ERM APPROVAL. |
| | |
| | 6B. PROVIDE A STANDARD CONSTRUCTION SCHEDULE SHOWING |
| | THE CANOPY FOOTINGS WILL NOT BE INSTALLED UNTIL AFTER |
| | THE TANK PIT IS BACK-FILLED. |
| | |
| | 7. - 16. PLEASE PROVIDE: ALL DIGITALLY SUBMITTED |
| | DOCUMENTATION INCLUDING PLANS AND SPECIFICATIONS NEEDS |
| | TO BE DIGITALLY SIGNED AND SEALED; SEE SIGNATURES STOP. |
| | |
| | 17. - 21. ALL SUBMITTED AND DEFERRED SUBMITTALS |
| | INCLUDING PRODUCT APPROVALS SHALL BE SUBMITTED TO THE |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS |
| | HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. DEFERRAL OF |
| | ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE DEFERRED SUBMITTAL ITEMS |
| | SHALL NOT BE INSTALLED UNTIL THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE |
| | BEEN APPROVED BY THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. |
| | |
| | 22. PLEASE PROVIDE ROOFING SUB-PERMIT PRIOR TO ROOF |
| | WORK. |
| | |
| | 23. PLEASE BE ADVISED THAT REGARDING THE STRUCTURAL |
| | STEEL CONNECTIONS (WELDING & BOLTING) A THIRD PARTY |
| | ENGINEER IS TO COMPLETE THE INSPECTIONS AND AT TIME OF |
| | INSPECTION PROVIDE FROM CONTRACTOR THE WELD PROCEDURE |
| | SPECIFICATION AND WELDER PERFORMANCE QUALIFICATION |
| | RECORDS. |
| | |
| | |
| | |
| | |
| | |
| | |