| 2021-02-16 17:15:21 | DENIED |
| | |
| | PERMIT 19020199 - UNDERGROUND FIBER FLAGLER AND FERN |
| | MCIMETRO PROJECT #1806CQB.1 1/2021 RESUBMITTAL |
| | |
| | PROVIDE WRITTEN RESPONSE TO COMMENTS. |
| | |
| | THE FOLLOWING ITEMS NEED TO BE ADDRESSED OR THE PERMIT |
| | WILL NOT BE APPROVED. |
| | |
| | 1) ENGINEERING PLAN - THE REVISED BORE LOCATION |
| | INCLUDES A CROSSING OF FERN STREET WHICH INCLUDES A |
| | PROPOSED OPEN CUT, THREE FEET DEEP, LEADING TO HANDHOLE |
| | 8+95. THE LOCATION OF THE PROPOSED OPEN CUT IS AN AREA |
| | THAT INCLUDES BIOSWALE PITS THAT ARE SURROUNDED BY |
| | STRUCTURAL SOIL. THE STRUCTURAL SOIL HAS EXACTING |
| | INSTALLATION STANDARDS AND MAY NOT BE DISTURBED. YOU |
| | NEED TO GET THE AS BUILT DRAWINGS SHOWING THE LIMITS OF |
| | THE STRUCTURAL SOIL AND DESIGN YOUR INSTALLATION TO |
| | AVOID THE STRUCTURAL SOIL. IF THERE IS ROOM BETWEEN THE |
| | TWO AREAS OF STRUCTURAL SOIL (AROUND EACH BIOSWALE TREE |
| | PIT) THEN THE FERN STREET CROSSING SHOULD BE DIRECT |
| | FROM HANDHOLE 8+00 TO THE NEW HANDHOLE ON THE SOUTH |
| | SIDE OF THE STREET (DO NOT WRAP AROUND THE BIOSWALE |
| | TREE PIT). |
| | |
| | PLEASE NOTE: |
| | |
| | THE INSTALLATION CONTRACTOR MUST CONTACT SUNSHINE 811 |
| | TO VERIFY THE LOCATION OF ALL UTILITIES AND VERIFY ALL |
| | DEPTHS PRIOR TO CONSTRUCTION. ALL CITY UTILITIES MUST |
| | BE LOCATED BY SOFT DIG METHODS BEFORE STARTING THE |
| | WORK. |
| | |
| | THE RIGHT-OF-WAY USE PERMIT REQUIRES YOU TO PROVIDE A |
| | CERTIFICATE OF LIABILITY INSURANCE, WHICH IN ACCORDANCE |
| | WITH SECTION 78-406 OF THE CITY CODE SPECIFICALLY NAMES |
| | THE CITY OF WEST PALM BEACH, ITS COMMISSIONERS, |
| | OFFICERS, EMPLOYEES AND AGENTS AS ADDITIONAL INSURED. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |