2019-03-22 17:04:581ST REVIEW FBC-2017 MECHANICAL
 PERMIT #19020191
 3/22/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.C
  
 1) THE AC CALCULATIONS ARE MISSING MANY OF THE COMMON
 AREAS SYSTEMS THAT ARE LISTED IN THE SCHEDULE ON SHEET
 M602- SECTION C403.2.1 FBC EC
  
 2) THE ENERGYGAUGE COMPLIANCE REPORT IS MISSING
 COMPLIANCE DATA FOR MANY OF THE COMMON AREAS SYSTEMS
 SHOWN IN THE SCHEDULE ON M602- SECTION C103.1 FBC EC.
  
 3) THE AC AND ENERGYGAUGE REPORT MUST BE ELECTRONICALLY
 SIGNED AND SEALED BY THE FL. LICENSED ENGINEER WHO
 PREPARED THE DOCUMENTS- SECTION C103.1.1.1.2 FBC EC,
 AND SECTION 61G15-23.005 FAC.
  
 4) COMMISSIONING OF THE MECHANICAL SYSTEMS, SERVICE
 WATER HEATING SYSTEMS, AND ELECTRICAL POWER AND
 LIGHTING SYSTEMS IS REQUIRED PER SECTION C408.2 FBC EC
 PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW,
 AND SUBMIT A COMMISSIONING PLAN PER SECTION C408.2.1.
  
 C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER'S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 C408.2.1. COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 5) PLEASE REVIEW THE FOLLOWING LIST OF REQUIRED
 SUBMITTALS AND NOTE THEM ON THE PLANS.
  
 REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP
 DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME
 OF INSPECTION.
 A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS.
 B) MOTORIZED AND BAROMETRIC DAMPERS
 C) DUCT SMOKE DETECTORS
 D) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES
 INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 E) AC STAND NOA'S OR FL. PRODUCT APPROVALS
 F) CLOTHES DRYERS
 G) COOKING APPLIANCES
 H) TEST AND BALANCE REPORTS
  
 SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR
 INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND
 APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR
 DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE
 TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED
 ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE
 STRUCTURAL ENGINEER RECORD.
 B) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR
 DUCTS AND VENT FLUES.
 C) COMMISSIONING REPORTS
  
 5) SHEET M001: THE VENTILATION CALCULATIONS ARE NOT IN
 COMPLIANCE WITH TABLE 403.3.1.1 FBC M. THEY ARE BASED
 ON AN ASHRAE STANDARD THAT IS NOT REFERENCED IN THE
 FBC-17.
 PLEASE MAKE THESE CORRECTIONS:
 A) LOBBY- 30 PERSONS PER 1000 SF. (7.5 CFMS PER PERSON)
 + (.06 CFMS PER SF) = 760 CFMS
 B) MULTIPURPOSE- 120 PERSONS PER 1000 SF. (5 CFMS PER
 PERSON) + (.06 CFMS PER SF) = 330 CFMS.
 C) CORRIDORS- NO CALCULATIONS PROVIDED.
  
 6) SHEET M001: THE VENTILATION CALCULATIONS ARE NOT IN
 COMPLIANCE WITH TABLE 403.3.1.1 FBC M. THEY ARE BASED
 ON AN ASHRAE STANDARD THAT IS NOT REFERENCED IN THE
 FBC-17.
 PLEASE MAKE THESE CORRECTIONS:
 A) LOBBY- 30 PERSONS PER 1000 SF. (7.5 CFMS PER PERSON)
 + (.06 CFMS PER SF) = 760 CFMS
 B) MULTIPURPOSE- 120 PERSONS PER 1000 SF. (5 CFMS PER
 PERSON) + (.06 CFMS PER SF) = 330 CFMS.
 C) CORRIDORS- NO CALCULATIONS PROVIDED.
  
 7) TO HELP EXPEDITE THE REVIEW PROCESS, PLEASE LABEL
 ALL THE ROOMS AND SPACES ON THE MECHANICAL FLOOR PLANS-
 SECTION 107.1 WPB
  
 8) MECHANICAL FLOOR PLAN LEVELS 1-8 (A & B) PLANS EACH
 SHOW O/A DUCTS PENETRATING THE 1 HR. FIRE-RATED
 CORRIDOR WALLS WITHOUT FIRE DAMPERS, HOWEVER ON LEVELS
 2-8, FIRE DAMPERS ARE SHOWN WHERE THE O/A DUCTS
 PENETRATE THE 1HR. FIRE-RATED LAUNDRY AND ELECTRICAL
 ROOM WALLS. PLEASE SEE SHEETS G111 & G113 & SECTION
 607.5.3 FBC M AND SHOW COMPLIANCE.
  
 9) MECH LEVELS 1-8: NO O/A PROVIDED TO THE STUDIES AND
 LOUNGES- TABLE 403.1.1 FBC M.
  
 10) M111A: FIRE DAMPER MISSING AT THE 22"X6"DIFFUSER
 PENETRATION OF RECEPTION ROOM WALL.
  
 11) M111A: HOW IS ACCESS BEING PROVIDED TO AHU-L1-5?-
 SECTION 306.1 FBC M. PLEASE NOTE THAT AC CLOSETS THAT
 ARE PLENUM RETURNS MUST HAVE DOORS MADE OF
 NON-COMBUSTIBLE MATERIALS OR HAVE A FLAME SPREAD INDEX
 OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT
 MORE THAN 50 - SECTION 602.2 FBC M.
  
 12) M111B: PROVIDE A SEQUENCE OF OPERATION FOR EF-3-
 SECTION 501.4 FBC M.
  
 13) M111B: HOW IS THE TRASH/RECYCLING ROOM VENTILATED?
 THERE IS AN AC SYSTEM BUT NO O/A AIR OR EXHAUST. PLEASE
 NOTE THAT TABLE 6-4 ASHRAE 62.1 REQUIRES EXHAUST
 VENTILATION IN THOSE ROOMS.
  
 14) M111B: NO O/A PROVIDED TO ROOM 107- TABLE 403.3.1.1
 FBC M.
  
 15) M111B: NO DOOR OR ACCESS PROVIDED TO AHU-1L-3-
 SECTION 306.1 FBC.
  
 16) M121B: SUPPLY CFMS NOT SHOWN AT DIFFUSERS SUPPLYING
 THE ELEVATOR LOBBY AND ROOMS 213 AND 214. BRANCH DUCT
 SIZES NOT SHOWN AT SAME LOCATIONS- SECTION 603.
  
 17) M121B: O/A MISSING TO ROOM 208.
  
 18) M121B: HOW IS ACCESS PROVIDED TO AHU-2L-2- SECTION
 306.1 FBC M.
  
 19) M131B- M181B: COMMENTS #15, 16, & 17 APPLY TO THESE
 PLAN SHEETS IN THE SAME LOCATIONS RESPECTIVE OF THEIR
 PARTICULAR ROOM AND AC SYSTEM NUMBERS.
  
 20) M191B: PROVIDE AN EQUIPMENT SCHEDULE FOR THE WATER
 HEATER, INTAKE DUCT AND EXHAUST FLUE, AND SUBMIT
 MANUFACTURER?S SPECIFICATIONS (MAY BE DEFERRED).
  
 21) M411: THE 14"X6" RETURN TRANSFER FROM THE BEDROOM
 IS UNDERSIZED- SEE SECTION 601.6.
  
 22) M412: THE 14"X6" RETURN TRANSFER FROM THE BEDROOM
 IS UNDERSIZED- SEE SECTION 601.6.
  
 23) M413: HP-B IS NOT SHOWN IN THE SCHEDULES AND IS
 MOST LIKELY A TYPO- PLEASE CORRECT.
  
 24) M413: NO AC SYSTEM IS SHOWN IN THE AC CLOSET BY THE
 BEDROOM- SECTION 107.2.1 WPB.
  
 25) M413: THE 14"X6" RETURN TRANSFER FROM THE BEDROOM
 IS UNDERSIZED- SEE SECTION 601.6.
  
 26) M417: HP-B IS NOT SHOWN IN THE SCHEDULES AND IS
 MOST LIKELY A TYPO- PLEASE CORRECT.
  
 27) M417: THE 12"X6" RETURN TRANSFER FROM THE BEDROOM
 IS UNDERSIZED- SEE SECTION 601.6.
  
 28) M419: THE 14"X6" RETURN TRANSFER FROM THE BEDROOM
 IS UNDERSIZED- SEE SECTION 601.6.
  
 29) M420: THE 14"X6" RETURN TRANSFER FROM THE BEDROOM
 IS UNDERSIZED- SEE SECTION 601.6.
  
 30) M501: A SHUTOFF DAMPER IS REQUIRED FOR THE SHAFT
 VENT- SECTION C403.2.4.3 FBC EC SHUTOFF DAMPERS
 OUTDOOR AIR INTAKE AND EXHAUST OPENINGS AND STAIRWAY
 AND SHAFT VENTS SHALL BE PROVIDED WITH CLASS I
 MOTORIZED DAMPERS. THE DAMPERS SHALL HAVE AN AIR
 LEAKAGE RATE NOT GREATER THAN 4 CFM/FT2 (20.3 L/S ? M2)
 OF DAMPER SURFACE AREA AT 1.0 INCH WATER GAUGE (249 PA)
 AND SHALL BE LABELED BY AN APPROVED AGENCY WHEN TESTED
 IN ACCORDANCE WITH AMCA 500D FOR SUCH PURPOSE.
 OUTDOOR AIR INTAKE AND EXHAUST DAMPERS SHALL BE
 INSTALLED WITH AUTOMATIC CONTROLS CONFIGURED TO CLOSE
 WHEN THE SYSTEMS OR SPACES SERVED ARE NOT IN USE OR
 DURING UNOCCUPIED PERIOD WARM-UP AND SETBACK OPERATION,
 UNLESS THE SYSTEMS SERVED REQUIRE OUTDOOR OR EXHAUST
 AIR IN ACCORDANCE WITH THE FLORIDA BUILDING CODE,
 MECHANICAL OR THE DAMPERS ARE OPENED TO PROVIDE
 INTENTIONAL ECONOMIZER COOLING.
 STAIRWAY AND SHAFT VENT DAMPERS SHALL BE INSTALLED WITH
 AUTOMATIC CONTROLS CONFIGURED TO OPEN UPON THE
 ACTIVATION OF ANY FIRE ALARM INITIATING DEVICE OF THE
 BUILDING'S FIRE ALARM SYSTEM OR THE INTERRUPTION OF
 POWER TO THE DAMPER.
  
 31) M601: PROVIDE CONTROL OPERATION DIAGRAMS FOR THE
 DOAS UNITS AND THE DUCT SMOKE DETECTORS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved