| 2019-03-19 10:26:18 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) THERE IS NO INDICATIONS OF EXISTING/NEW HADNRAIL |
| | DETAIL. |
| | |
| | HANDRAILS SHALL COMPLY WITH NFPA 101, CH 7, - |
| | |
| | |
| | 7.2.2.4 GUARDS AND HANDRAILS. |
| | 7.2.2.4.1 HANDRAILS. |
| | 7.2.2.4.1.1 STAIRS AND RAMPS SHALL HAVE HANDRAILS ON |
| | BOTH SIDES, |
| | UNLESS OTHERWISE PERMITTED IN 7.2.2.4.1.5 OR |
| | 7.2.2.4.1.6. |
| | 7.2.2.4.1.2 IN ADDITION TO THE HANDRAILS REQUIRED AT |
| | THE SIDES OF |
| | STAIRS BY 7.2.2.4.1.1, BOTH OF THE FOLLOWING PROVISIONS |
| | SHALL APPLY: |
| | (1) FOR NEW STAIRS, HANDRAILS SHALL BE PROVIDED WITHIN |
| | 30 IN. (760 |
| | MM) OF ALL PORTIONS OF THE REQUIRED EGRESS WIDTH. |
| | (2) FOR EXISTING STAIRS, HANDRAILS SHALL MEET THE |
| | FOLLOWING CRITERIA: |
| | (A) THEY SHALL BE PROVIDED WITHIN 44 IN. (1120 MM) OF |
| | ALL |
| | PORTIONS OF THE REQUIRED EGRESS WIDTH. |
| | (B) SUCH STAIRS SHALL NOT HAVE THEIR EGRESS CAPACITY |
| | ADJUSTED |
| | TO A HIGHER OCCUPANT LOAD THAN PERMITTED BY THE |
| | CAPACITY |
| | FACTOR IN TABLE 7.3.3.1 IF THE STAIR?S CLEAR WIDTH |
| | BETWEEN |
| | HANDRAILS EXCEEDS 60 IN. (1525 MM). |
| | |
| | PLEASE REVIEW AND ENSURE COMPLIANCE. FIRE INSPECTOR |
| | WILL COMFIRM ON FIRE INSPECTIONS. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |