| Plan Review Notes For Permit 19011027 |
| Permit Number |
19011027 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-05-13 09:10:35 | 1) SUBMIT TWO COPIES OF THE MANUFACTURING | | | SPECIFICATIONS FOR THE GENERATOR. 2ND. REQUEST. WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | 2) SUBMIT TWO COPIES OF LEGIBLE SPECIFICATION SHEETS | | | FOR THE GAS REGULATOR. IDENTIFY ON THE SPECIFICATION | | | SHEET THE SPECIFIC REGULATOR THAT IS BEING INSTALLED. | | | WPB AMEND. TO FBC SEC. 107.2.1. | | | 3) THE PROPANE TANK INSTALLATION DETAILS NOTE THAT THE | | | PLANS ARE LICENSED TO MARK'S GAS AND ALSO NOTES THAT | | | "THAT NO UNAUTHORIZED USE, REPRODUCTION, COPIES OR | | | DERIVATIVE WORKS ARE ALLOWED WITHOUT THE WRITTEN | | | CONSENT OF THE OWNER." THE GAS APPLICATION HAS | | | PERSONALIZED AC AS THE CONTRACTOR, NOT MARK'S GAS. IN | | | ADDITITION, A PROFESSIONAL ENGINEER SHALL SIGN, DATE | | | AND SEAL ALL FINAL PLANS, PRINTS, SPECIFICATIONS, | | | REPORTS, OR OTHER DOCUMENTS PREPARED OR ISSUED BY THE | | | LICENSEE AND BEING FILED FOR PUBLIC RECORD. COPIES OF A | | | SIGNATURE AND SEAL ARE NOT ACCEPTABLE PER FL. ADMIN. | | | CODE RULE 61G15-23.001. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|