| Date |
Text |
| 2019-01-22 14:45:03 | BUILDING PLAN REVIEW - THRESHOLD BUILDINGS |
| | 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | BUILDING PLANS EXAMINER, PX3169 |
| | 1&2 FAMILY PLANS EXAMINER, SFP306 |
| | CONSTRUCTION SERVICES DIVISION |
| | TEL: 561-805-6726 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | 1ST REVIEW |
| | RESULTS: DENIED |
| | YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED |
| | BELOW. |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | THRESHOLD BUILDING |
| | CONFORMING TO CHAPTER 553 FLORIDA STATUTES, |
| | CHAPTER 468, PART XII, FLORIDA STATUTES |
| | AND THE FLORIDA BUILDING CODE AS AMENDED BY CITY OF |
| | WEST PALM BEACH, CHAPTER 1, SECTION 110.8 |
| | |
| | 1. COMPLETE THE THRESHOLD / SPECIAL INSPECTOR AGREEMENT |
| | OF UNDERSTANDING; A COPY OF THE CURRENT SPECIAL |
| | INSPECTOR AGREEMENT HAS BEEN INCLUDED IN THE E-MAIL |
| | NOTIFICATION OF REVIEW RESULTS. |
| | |
| | 2. PROVIDE RESUMES AND COPIES OF LICENSES FOR ALL |
| | PROPOSED INSPECTORS. |
| | |
| | 3. THRESHOLD STATEMENT REQUIRED BY FS553.79(7)(D) - |
| | ENGINEER, REVISE THE STATEMENT SO IT IS CLEAR THAT IT |
| | IS FOR COMPLIANCE WITH THE STATUTORY REQUIREMENT. |
| | SUGGESTED: |
| | |
| | REQUIRED FOR ALL |
| | |
| | "PER FS553.79, TO THE BEST OF THE ENGINEER'S KNOWLEDGE, |
| | THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE |
| | MINIMUM BUILDING CODES AND THE APPLICABLE FIRE SAFETY |
| | STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN |
| | ACCORDANCE WITH THIS CHAPTER AND CHAPTER 633." |
| | |
| | |
| | 110.8 THRESHOLD BUILDING. |
| | 110.8.1 THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL |
| | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A |
| | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION |
| | PLAN PREPARED BY THE ENGINEER OR ARCHITECT OF RECORD. |
| | THE STRUCTURAL INSPECTION PLAN MUST BE SUBMITTED TO THE |
| | ENFORCING AGENCY PRIOR TO THE ISSUANCE OF A BUILDING |
| | PERMIT FOR THE CONSTRUCTION OF A THRESHOLD BUILDING. |
| | THE PURPOSE OF THE STRUCTURAL INSPECTION PLANS IS TO |
| | PROVIDE SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO |
| | THAT THE BUILDING CAN BE ADEQUATELY INSPECTED FOR |
| | COMPLIANCE WITH THE PERMITTED DOCUMENTS. THE SPECIAL |
| | INSPECTOR MAY NOT SERVE AS A SURROGATE IN CARRYING OUT |
| | THE RESPONSIBILITIES OF THE BUILDING OFFICIAL, THE |
| | ARCHITECT OR THE ENGINEER OF RECORD. THE CONTRACTOR'S |
| | CONTRACTUAL OR STATUTORY OBLIGATIONS ARE NOT RELIEVED |
| | BY ANY ACTION OF THE SPECIAL INSPECTOR. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO SUBMITTAL AND LEAVE THE PREVIOUSLY |
| | REVIEWED SHEETS DETACHED. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |