| Plan Review Notes For Permit 19010660 |
| Permit Number |
19010660 |
|
| Review Stop |
P |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2019-05-15 10:13:09 | PLUMBING PROVISO: | | | | | | SHALL COMPLY PRIOR TO 1ST ROUGH INSPECTION. | | | | | | 1. PROVIDE FLOOR PLAN AND ISOMETRIC DRAWING FOR GREASE | | | INTERCEPTOR AND CONNECTED FIXTURES. PER WPB AMEND TO | | | FBC 107.3.5.1.3(13) | | | | | | 2. PROVIDE INSTALLATION GUIDE FOR GREASE INTERCEPTOR. | | | FBC PL 1002.4.1 | | | | | | 3. MOVABLE SINK SYSTEMS SHALL COMPLY WITH ASME | | | A112.19.12. THE MANUFACTURE SPECIFICATIONS PROVIDED FOR | | | THE HAND SINK AT THE BAR DO NOT COMPLY PLEASE PROVIDE | | | SPECIFICATIONS THAT SHOW COMPLIANCE OR A SINK SYSTEM | | | THAT DOES COMPLY. PER FBC PL 418.3 | | | | | | | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] |
|