| Date |
Text |
| 2019-09-05 16:43:35 | PLUMBING COMMEMTS:APPROVED WITH PROVISO |
| | 1. RE: OCCUPANT LOAD. AS DIRECTED BY ROBERT BROWN, |
| | BUILDING OFFICIAL, CITY OF WEST PALM BEACH, IN |
| | CONVERSATION WITH ROBERT BROWN, JIM WHITMER AND JERALD |
| | SMITH, ASSIGN THREE (3) EACH CUSTOMERS TO EACH OF THE |
| | TWO (2) BIRTHING ROOMS. DEDUCT SQUARE FOOTAGE OF THE |
| | TWO ROOMS, INCLUDING BATHROOMS (551.5 SQ. FT.) FROM THE |
| | TOTAL SQUARE FOOTAGE (2035.75 SQ. FT.) LEAVING A TOTAL |
| | OF 1480 SQ. FT./100=15 OCCUPANTS |
| | 2. ROOMS 122, 123 AND 126 SHALL COMPLY WITH FBC ACC |
| | 212.3, HAVING CLEAR FLOOR SPACE (FBC ACC 606.2)AND |
| | PROVIDE A MAXIMUM HEIGHT OF 34? TO TOP OF COUNTER OR |
| | SINK RIM, WHICHEVER IS HIGHER (FBC ACC 606.3), OR THE |
| | OWNER SHALL PROVIDE A LETTER, SIGNED AND DATED STATING |
| | THAT IF ANY EMPLOYEE OR POTENTIAL EMPLOYEE SHOULD |
| | REQUIRE ACCESSIBILITY TO PERFORM THEIR DUTIES IN ANY OF |
| | THE STATED ROOMS THAT THE OWNER SHALL BRING SAID ROOMS |
| | INTO COMPLIANCE. |
| | 3. A SEPARATE PERMIT IS REQUIRED FOR THE NEW BACKFLOW |
| | PREVENTOR. PROVIDE CERTIFICATION DOCUMENTS AT FINAL |
| | INSPECTION. |
| | 4. PROVIDE SPECIFICATION SHEETS FOR TANKLESS WATER |
| | HEATERS SHOWING INTEGRAL RECIRCULATING PUMPS. SUBMITTAL |
| | SHALL BE SUBMITTED, APPROVED AND IN PLACE PRIOR TO |
| | FINAL INSPECTION. |
| | 5. RE: P2.02; WATER RISER DIAGRAM. PROVIDE FULL OPEN |
| | ACCESSIBLE VALVE ON EACH DOWNFEED PIPE PER FBC PL |
| | 606.1(5) AND 606.3. VALVES SHALL BE IDENTIFIED PER FBC |
| | PL 606.4 |
| | 6. PROVIDE ANTI-SCALD SHOWER CONTROL VALVE FOR SECOND |
| | FLOOR SHOWER PER FBC PL 424.3. |
| | 7. PROVIDE TEMPERATURE LIMITING DEVICE FOR P-6 THERAPY |
| | TUBS ON GROUND FLOOR AND FOR THE SECOND FLOOR BATHTUB |
| | PER FBC PL 423.5 |
| | 8. WASHING MACHINE SHUT OFF VALVES SHALL BE ACCESSIBLE |
| | PER FBC PL 606.3. |
| | |