| 2019-01-29 15:08:18 | 1) EACH SHEET OF THE PLAN IS REQUIRED TO BE DIGITALLY |
| | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE |
| | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE |
| | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE |
| | CORRECTION. FL. ADMINISTRATIVE CODE RULE 61G15-23.004. |
| | 2) SHOW THE PROPOSED LOCATION OF THE POOL ON THE |
| | SURVEYS. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 3) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC |
| | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION |
| | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT |
| | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED |
| | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET |
| | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS |
| | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING |
| | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, |
| | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT |
| | THE PUMP. |
| | 4) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| | CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, |
| | 4.4.9.1 |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |