| 2019-02-01 13:38:21 | RESIDENTIAL (R3)ALTERATION/ADDITION BUILDING REVIEW |
| | COMMENTS. |
| | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| | |
| | 1- PROVIDE ENERGY CALCULATIONS (2 COPIES) AS REQUIRED |
| | BY SEC. 1106 FBC-EXISTING BUILDING AND SEC. R101.4.2 |
| | AND R101.5 FBC-ENERGY CONSERVATION. |
| | |
| | 2- INFORMATION ON SHEET 02 FOR PROPOSED ROOF FRAMING |
| | PLAN IS NOT CLEAR. SEC. 107.2.1 CITY AMENDMENTS. |
| | A) CLEARLY SPECIFY WHAT AT ARE THE EXISTING AND |
| | PROPOSED ROOF FRAMING MEMBERS. CLEARLY SPECIFY SIZES OF |
| | ALL ROOF FRAMING MEMBERS. CLEARLY SPECIFY ALL END |
| | CONNECTIONS OF THE ROOF FRAMING MEMBERS. |
| | |
| | B)ENGINEER TO PROVIDE COMPLETE DETAILS AND |
| | SPECIFICATIONS FOR THE PROPOSED UPTURNED BEAM. UPTURN |
| | BEAM DETAIL SUBMITTED DOESN'T SHOW A BEAM. PROVIDE |
| | COMPLETE DETAILS AND SPECIFICATIONS SHOWING HOW THE |
| | EXISTING TRUSSES ARE RE-ENGINEERED TO BE SUPPORTED ON |
| | THIS BEAM. SPECIFY CONNECTIONS AT THE ENDS OF THE BEAM. |
| | INFORMATION ON ROOF FRAMING PLAN AND DETAIL ON SAME |
| | SHEET DON'T MATCH. SEC. R301.1 FBC-RESIDENTIAL. |
| | |
| | C) STEEL POST DETAIL IS NOT CLEAR. SIZE OF BOTTOM AND |
| | TOP PLATES ARE NOT CLEAR. CONNECTION OF POST TO BOTTOM |
| | PLATE IS NOT SPECIFIED. CLARIFY CONNECTION OF ROOF |
| | FRAMING MEMBERS TO PROPOSED I BEAM. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | 3- PROPOSED FLOOR PLAN SHOWS NEW OPENINGS FOR DOORS AND |
| | WINDOWS. CLARIFY WHY SOME OPENINGS SHOW REINFORCEMENT |
| | AT THE ENDS OF THE OPENINGS AND SOME DON'T. CLARIFY |
| | /REVISE AS REQUIRED TO SHOW REINFORCEMENT AT EACH |
| | OPENING. SEC. 107.2.1 CITY AMENDMENTS. |
| | |
| | 4- PROVIDE PRODUCT APPROVAL (2 COPIES) AS REQUIRED BY |
| | FAC 61G20-3.001 FOR: |
| | (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED |
| | SUBMITTAL) |
| | |
| | A) NEW EXTERIOR DOORS SHOWN ON PLANS. |
| | |
| | B)WINDOW MULLIONS AS SHOWN ON PLANS. REQUIRED: CLEARLY |
| | SPECIFY MULLION SIZE TO BE USED TO VERIFY COMPLIANCE |
| | WITH THE CALCULATED DESIGN PRESSURES. |
| | |
| | 5- ENGINEER OF RECORD TO REVIEW AND APPROVE ABOVE |
| | PRODUCT APPROVALS AS REQUIRED BY SEC. 107.3.4.1 CITY |
| | AMENDMENTS. |
| | |
| | 6- PLANS NEED TO SPECIFY INSULATION IN THE GARAGE AREA |
| | THAT IS GOING TO BE CONVERTED TO BEDROOM. WALLS AND |
| | CEILING. SEC. R103.2 FBC-ENERGY CONSERVATION. NOTE: |
| | ENERGY CALCULATIONS AND PLANS TO BE COORDINATED TO |
| | AVOID CONFLICTS/DELAYS. |
| | |
| | 7- PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR |
| | REVISED MATERIALS MAY RESULT IN NEW PLAN REVIEW |
| | COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE/VOID THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | PLEASE DON'T STAPLE OLD DRAWINGS. SUBMIT OLD DRAWINGS |
| | FOR REFERENCE. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |