| Date |
Text |
| 2019-01-28 10:06:34 | 2017 FBC- BUILDING PLAN REVIEW |
| | W. P. B. PERMIT: 18120892 |
| | ADD: 4375 EASLEY DR. |
| | CONT: TBD/ TO BE DETERMINED |
| | TEL: 561-835-7406 |
| | E-MAIL: [email protected] |
| | |
| | 2017 FLORIDA BUILDING CODE W 2017 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION |
| | |
| | 2017 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW |
| | CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES |
| | SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA |
| | BUILDING CODE, BUILDING. |
| | |
| | 1ST REVIEW |
| | DATE: MON. JAN. 28/2019 |
| | ACTION: DENIED |
| | |
| | 1) IN REVIEWING THE COVERSHEET THE LIFE SAFETY SHEET |
| | 005-A-020 THE PLANS INDICATE THE BUILDING AND ADDITION |
| | IS TO BE FIRE SPRINKLERED. PLEASE SUBMIT FIRE SPRINKLER |
| | PLANS. |
| | 107.3.5 MINIMUM PLAN REVIEW CRITERIA FOR BUILDINGS. |
| | 107.3.5.1 COMMERCIAL BUILDINGS: |
| | 107.3.5.1.1 BUILDING. |
| | 107.3.51.1. (5.) FIRE SUPPRESSION SYSTEMS SHALL |
| | INCLUDE: |
| | SCHEMATIC FIRE SPRINKLERS |
| | PRE-ENGINEERED SYSTEMS CAN BE SHOP DRAWINGS UNDER A |
| | SEPARATE PERMIT. |
| | |
| | FIRE SPRINKLERS 61G15-32.004 DESIGN OF WATER BASED FIRE |
| | PROTECTION SYSTEMS. |
| | (1) WATER BASED FIRE PROTECTION SYSTEMS INCLUDE, BUT |
| | ARE NOT LIMITED TO, AUTOMATIC SPRINKLER SYSTEMS OF WET, |
| | DRY, FINE WATER SPRAY (MIST), MANUAL, AND DELUGE VALVE |
| | CONTROLLED TYPES, PUMPING SYSTEMS, STANDPIPES, FIRE |
| | WATER MAINS AND DEDICATED FIRE PROTECTION WATER |
| | SOURCES. |
| | (2) TO ENSURE MINIMUM DESIGN QUALITY IN FIRE PROTECTION |
| | SYSTEM ENGINEERING DOCUMENTS, SAID DOCUMENTS SHALL |
| | INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION WHEN |
| | APPLICABLE: (A-M). |
| | |
| | 2) THE COVERSHEET LIST THE TOTAL UNDER ROOF SQUARE FEET |
| | OF THE BUILDING AS 7,675 SQ. FT. THE NEW LAB IN ITSELF |
| | IS OVER THE 10% OF THE BUILDING. THE EXISTING LAB WOULD |
| | APPEAR TO BE AROUND 600 SQ. FT. OR A TOTAL AREA OF |
| | 1,949 SQ. FT. WHICH HAS OR COULD HAVE HAZARDOUS |
| | CHEMICALS. PLEASE PROVIDE THE CHEMICALS TO BE USED IN |
| | THE LAB AND MSDS SHEETS, AMOUNT OF CHEMICALS THAT ARE |
| | TO BE USED IN EACH OF THE LAB AREAS, IF THE CHEMICALS |
| | ARE TO BE STORED IN 1 HOUR RATED FIRE CABINETS. THE |
| | PLANS FAIL TO SHOW A FIRE SEPARATION (FIRE BARRIERS) |
| | FOR CONTROL AREAS FROM THE REMAINDER OF THE BUILDING. |
| | |
| | 2017 FBC-B 307.1 HIGH-HAZARD GROUP H OCCUPANCY |
| | INCLUDES, AMONG OTHERS, THE USE OF A BUILDING OR |
| | STRUCTURE, OR A PORTION THEREOF, THAT A PHYSICAL OR |
| | HEALTH HAZARD IN QUANTITIES IN EXCESS OF THOSE ALLOWED |
| | IN CONTROL AREAS COMPLYING WITH SECTION 414, BASED ON |
| | THE MAXIMUM ALLOWABLE QUANTITY LIMITS FOR CONTROL AREAS |
| | SET FORTH IN TABLES 307.1(1) AND 307.1(2). |
| | PLEASE SEE SECTION 414.2 OF THE 2017 FBC-B FOR CONTROL |
| | AREAS. |
| | |
| | 3) THE SHEET 023-S-2 UNDER THE HEADING OF FOUNDATIONS |
| | NOTE # 1 INDICATES THERE IS A SOILS REPORT PREPARED BY |
| | FEDERAL ENGINEERING AND TESTING, DATED AUGUST 24, 2018. |
| | PLEASE SUBMIT A PAPER ORIGINAL SIGNATURE AND SEALED OR |
| | SUBMIT ELECTRONICALLY WITH AN ELECTRONIC SIGNATURE. |
| | |
| | 4A) PLEASE REVIEW SHEET 023-S-2 THE NEGATIVE VALUES |
| | (PRESSURES) FOR VULT AND VASD ARE THE SAME THE VASD |
| | VALUES SHOULD BE MULTIPLIED BY THE 0.6 TO BECOME VASD. |
| | 2017 FBC-B 1609.3.1 WIND SPEED CONVERSION VULT TO VASD. |
| | THE WALL NEGATIVE PRESSURES ALSO APPEAR FOR THE WALL |
| | ALSO APPEAR 3.5 LBS. LOW PRESSURES ARE TAKEN AT 15 FEET |
| | ABOVE GRADE, THAT IS THE LAST PRESSURE GIVEN IN THE |
| | TABLES IN 1609 AND IN ASCE 7-10. |
| | |
| | 4B) PRESSURES (NEGATIVE) GIVEN ON SHEET 012-A-200 FOR |
| | THE WALL ALSO APPEAR 3.5 LBS. LOW PRESSURES ARE TAKEN |
| | AT 15 FEET ABOVE GRADE THAT IS THE LAST PRESSURE GIVEN |
| | IN THE TABLES IN 1609 AND IN ASCE 7-10. |
| | |
| | 5) COMPONENTS & CLADDING. 2017 FBC-B 1609.1.2 |
| | PROTECTION OF OPENINGS, 1609.6.4.4.1 COMPONENTS & |
| | CLADDING. FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS, |
| | ADMINISTRATIVE CODE 61G20-3.005, RULE 9N-3 NOV. 01/ |
| | 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION |
| | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: |
| | (31)(A) EXTERIOR DOORS, MULLIONS & ROOF HATCHES. |
| | (B) WINDOWS & MULLIONS |
| | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL |
| | LOUVERS, EFIS SYSTEMS, |
| | (D) ROOFING PRODUCTS AND ASSEMBLIES, LIGHTWEIGHT |
| | CONCRETE AND OR INSULATION, |
| | |
| | 6) IDENTIFY GLAZING/ MULLIONS. PLEASE IDENTIFY ON THE |
| | PRODUCT APPROVAL BEFORE SUBMITTING TO DESIGNER OF |
| | RECORD AND BEFORE SUBMISSION TO THE BUILDING |
| | DEPARTMENT. FOR ALL PRODUCTS WITH GLAZING, PLEASE |
| | IDENTIFY THE OPENING WIDTH & HEIGHT, TYPE OF GLAZING, |
| | MULLION SIZE, LENGTH IF UNREINFORCED OR REINFORCED |
| | INFORMATION IF REQUIRED, ATTACHMENTS AND ASSOCIATE |
| | PRESSURES FOR EACH OPENING SIZE. 2014 FBC-B 1405.13.1 |
| | INSTALLATION. WINDOWS AND DOORS SHALL BE INSTALLED IN |
| | ACCORDANCE WITH APPROVED MANUFACTURER?S INSTRUCTIONS. |
| | FASTENER SIZE AND SPACING SHALL BE PROVIDED IN SUCH |
| | INSTRUCTIONS AND SHALL BE CALCULATED BASED ON MAXIMUM |
| | LOADS AND SPACING USED IN THE TESTS. |
| | |
| | 7) ROOFING: FOR ALL ROOFING PRODUCTS PLEASE IDENTIFY |
| | ALL ROOFING SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES |
| | FOR ROOF ZONE # 1. REVIEW THE PRODUCT APPROVAL |
| | LIMITATIONS, IF ENHANCED FASTENING IS ALLOWED FOR ROOF |
| | ZONES 2 & 3. FASTENER DENSITIES SHALL BE INCREASED FOR |
| | BOTH INSULATION & THE BASE SHEET AS CALCULATED IN |
| | COMPLIANCE WITH ROOFING APPLICATION STANDARDS RAS 117. |
| | CALCULATION PREPARED, SIGNED AND |
| | SEALED BY A FLORIDA REGISTERED PROFESSIONAL ENGINEER OR |
| | REGISTERED ARCHITECT. 1609.6.4.4.1 COMPONENTS & |
| | CLADDING. |
| | 107.2.1.2 FOR ROOF ASSEMBLIES REQUIRED BY THE CODE, THE |
| | CONSTRUCTION DOCUMENTS SHALL ILLUSTRATE, DESCRIBE AND |
| | DELINEATE THE TYPE OF ROOFING SYSTEM, MATERIALS, |
| | VENTING, FASTENING REQUIREMENTS, FLASHING REQUIREMENTS |
| | AND WIND RESISTANCE RATING THAT ARE REQUIRED TO BE |
| | INSTALLED. PRODUCT EVALUATION AND INSTALLATION SHALL |
| | INDICATE COMPLIANCE WITH THE WIND CRITERIA REQUIRED FOR |
| | THE SPECIFIC SITE. |
| | |
| | 8) 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF |
| | THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | 9) THE ARCHITECTURAL AND STRUCTURAL SHEETS INDICATE THE |
| | ADDITION IS TO HAVE A BAR JOIST AND METAL DECK ROOF |
| | SYSTEM. PLEASE HAVE A 3RD PARTY ENGINEER REVIEW ALL |
| | WELDED JOINTS AND BOLTED JOINTS AND SUPPLY A SIGNED AND |
| | SEALED LETTER OF THE INSPECTIONS AT THE TIME OF THE |
| | WINDOW BUCK INSPECTION AND BEFORE THE INTERIOR FRAMING |
| | INSPECTION. IF THERE IS ANY QUESTIONS IN REGARDS TO |
| | BUILDING INSPECTIONS PLEASE CONTACT THE CHIEF BUILDING |
| | INSPECTOR KEN CONRAD AT 561-805-6666. |
| | WELDED OR BOLTED CONNECTIONS. THE CONTRACTOR IS |
| | REQUIRED TO PROVIDE WELD PROCEDURE SPECIFICATIONS & |
| | WELDER OPERATOR PERFORMANCE QUALIFICATION RECORDS IN |
| | ACCORDANCE WITH THE REFERENCED STANDARDS AT TIME OF |
| | INSPECTION. |
| | 2017 FBC-B 2204.1 WELDING |
| | 2017 FBC-B 2204.2 BOLTING. |
| | |
| | 10) ENERGY CODE. THE APPLICANT HAS SUBMITTED THE ENERGY |
| | GAUGE SUMMIT ASHRAE 90.1 ENERGY COST BUDGET OPTION OF |
| | CODE COMPLIANCE FOR ENERGY. THE QUESTION THAT I HAVE IS |
| | ON THE INPUT DATA REPORT PAGE 2 FOR THE EXTERIOR WALLS |
| | THE REPORT SHOWS WIDTH AND HEIGHT (EFFECTIVE) OF THE |
| | WALLS. THE QUESTION IS THE HEIGHT OF THE WALL IS GIVEN |
| | AT 9 FEET AND ON SHEET A-220 ALL OF THE DETAILS SHOW |
| | THE EXTERIOR WALL INSULATION GOING UP TO 9 FEET THE |
| | HEIGHT OF THE DROPPED CEILING, WHEREAS THE ROOF TOP |
| | INSULATION IS GIVEN AT A HEIGHT OF 12 FOOT 3 INCHES. |
| | PLEASE PROVIDE WHY THE EXTERIOR WALL INSULATION OR THE |
| | EXTERIOR SOFFIT AND FACIA WOULD NEED TO COMPLETE THE |
| | INSULATION TO THE ROOF LINE, TO MAKE A COMPLETE |
| | ENVELOPE? |
| | |
| | 2017 FBC-ENERGY CODE C304.3.2.2 APPLICANT-DETERMINED |
| | ASSEMBLY U-FACTORS, C-FACTORS, F-FACTORS OR HEAT |
| | CAPACITIES. IF THE BUILDING OFFICIAL DETERMINES THAT |
| | THE PROPOSED CONSTRUCTION ASSEMBLY IS NOT ADEQUATELY |
| | REPRESENTED IN THE APPROPRIATE TABLE OF ASHRAE 90.1 |
| | NORMATIVE APPENDIX A, THE APPLICANT SHALL DETERMINE |
| | APPROPRIATE VALUES FOR THE ASSEMBLY USING THE |
| | ASSUMPTIONS IN ASHRAE 90.1 NORMATIVE APPENDIX A. |
| | |
| | 11A) THE ROOF PLAN, SHEETS 011-A-110, 039-P1.2 AND |
| | 013-A-220 ALL REPRESENT THE ROOF PLAN. THE SHEET P1.2 |
| | DOES GIVE THE ROOF AREA AND PARAPET TO BE DRAINED AND |
| | THE SIZE OF THE VERTICAL LEADERS. WHAT IS MISSING IS |
| | THE ANNUAL RAIN FALL. SEE 1503.4 ROOF DRAINAGE OF THE |
| | 2017 FBC-B. UNLESS ROOFS ARE SLOPED TO DRAIN OVER ROOF |
| | EDGES, DESIGN AND INSTALLATION OF ROOF DRAINAGE SYSTEMS |
| | SHALL COMPLY WITH SECTION 1503 AND THE FLORIDA BUILDING |
| | CODE, PLUMBING, CHAPTER 11. |
| | |
| | 11B) PLEASE REVIEW SHEET 011-A-110 THE ROOF PLAN. |
| | DETAIL 3 INDICATES THE NEW ROOF LINE IS IN AT A HIGHER |
| | ELEVATION THAN THE OLD ROOF. WHEN VIEWING THE EXISTING |
| | ROOF LINE IN DETAIL 1 IN THE END VIEW OF THE ROOF IT |
| | APPEARS THAT THERE IS 2 EMERGENCY OVERFLOW SCUPPERS |
| | THAT WILL BE NO LONGER EFFECTIVE SINCE THE NEW ROOF |
| | LINE IS HIGHER? HOW OR WHERE WILL THE EMERGENCY |
| | OVERFLOWS BE LOCATED IN THE EXISTING ROOF? |
| | |
| | 2017 FBC-B 1503.4.1 SECONDARY (EMERGENCY OVERFLOW) |
| | DRAINS OR SCUPPERS. WHERE ROOF DRAINS ARE REQUIRED, |
| | SECONDARY (EMERGENCY OVERFLOW) ROOF DRAINS OR SCUPPERS |
| | SHALL BE PROVIDED WHERE THE ROOF PERIMETER CONSTRUCTION |
| | EXTENDS ABOVE THE ROOF IN SUCH A MANNER THAT WATER WILL |
| | BE ENTRAPPED IF THE PRIMARY DRAINS ALLOW BUILDUP FOR |
| | ANY REASON. THE INSTALLATION AND SIZING OF SECONDARY |
| | EMERGENCY OVERFLOW DRAINS, LEADERS AND CONDUCTORS SHALL |
| | COMPLY WITH SECTIONS 1106 AND 1107, AS APPLICABLE, OF |
| | THE FLORIDA BUILDING CODE, PLUMBING, CHAPTER 11. |
| | |
| | 12) SHEET 015-A-401 DETAILS 3 AND 6 . |
| | 12A) DETAIL 3 SHOWS EITHER POWER DRIVEN FASTENER OR |
| | EXPANSION ANCHOR BEING INSTALLED INTO THE BOTTOM OF AN |
| | EXISTING PRE-CAST ROOF JOIST. PLEASE GET THE STRUCTURAL |
| | ENGINEER TO SIGN OFF ON THIS APPLICATION SINCE THE |
| | BOTTOM REINFORCING MAYBE ENDANGERED OR CONCRETE MAYBE |
| | CHIPPED OR CRACKED EXPOSING THE BOTTOM CHORD OF |
| | INFORCEMENT. 107.2.1.2 ADDITIONAL DATA. THE BUILDING |
| | OFFICIAL MAY REQUIRE DETAILS, COMPUTATIONS, STRESS |
| | DIAGRAMS, AND OTHER DATA NECESSARY TO DESCRIBE THE |
| | CONSTRUCTION OR INSTALLATION AND THE BASIS OF |
| | CALCULATIONS. ALL DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA REQUIRED BY THE BUILDING OFFICIAL TO |
| | BE PREPARED BY AN ARCHITECT OR ENGINEER SHALL BE |
| | AFFIXED WITH THEIR OFFICIAL SEAL, SIGNATURE AND DATE AS |
| | STATE LAW REQUIRES. |
| | |
| | 12B) PLEASE REVIEW DETAIL 6 OF THE SAME SHEET. HIGH HAT |
| | IS TO BE APPLIED TO THE CORNER OF AN EXISTING BEAM, THE |
| | PLANS SHOW ONE PIECE OF HIGH-HAT FLANGE AT THE CORNER |
| | OF THE BEAM THERE IS NO MENTION OF HOW TO ANCHOR THE |
| | HIGH HAT AND WHAT DISTANCE TO STAY AWAY FROM THE CORNER |
| | TO KEEP FROM THE CONCRETE FROM SPAWLING. . 107.2.1.2 |
| | ADDITIONAL DATA. THE BUILDING OFFICIAL MAY REQUIRE |
| | DETAILS, COMPUTATIONS, STRESS DIAGRAMS, AND OTHER DATA |
| | NECESSARY TO DESCRIBE THE CONSTRUCTION OR INSTALLATION |
| | AND THE BASIS OF CALCULATIONS. ALL DRAWINGS, |
| | SPECIFICATIONS AND ACCOMPANYING DATA REQUIRED BY THE |
| | BUILDING OFFICIAL TO BE PREPARED BY AN ARCHITECT OR |
| | ENGINEER SHALL BE AFFIXED WITH THEIR OFFICIAL SEAL, |
| | SIGNATURE AND DATE AS STATE LAW REQUIRES. |
| | |
| | 13) THE VALUE OF THE PROJECT WAS REDUCED FROM |
| | $1,686,678.00 TO $300,000.00 IN VALUE. PLEASE PROVIDE |
| | AN ITEMIZED LIST TO SEE WHAT WAS REMOVED FROM THE |
| | PROJECT VALUE, INCLUDE THE LINE ITEM VALUE FOR EACH |
| | ITEM REMOVED. |
| | 109.3* BUILDING PERMIT VALUATION. |
| | IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE |
| | CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE, |
| | ELECTRICAL, GAS, MECHANICAL, OR PLUMBING SYSTEMS |
| | APPEARS TO BE UNDER ESTIMATED ON THE APPLICATION, THE |
| | PERMIT SHALL BE DENIED. FOR PERMITTING PURPOSES, |
| | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT PURPOSES, VALUATION OF BUILDINGS AND |
| | SYSTEMS SHALL BE THE TOTAL REPLACEMENT VALUE TO INCLUDE |
| | STRUCTURAL, ELECTRICAL, PLUMBING, MECHANICAL, INTERIOR |
| | FINISHES, NORMAL SITE WORK (EXCAVATION AND BACKFILL FOR |
| | BUILDINGS), ARCHITECTURAL AND DESIGN FEES, MARKETING |
| | COST, OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS |
| | FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE |
| | CONGRESS. |
| | |
| | THIS MAIN BUILDING PERMIT WILL INCLUDE THE FEES FOR THE |
| | MECHANICAL, ELECTRICAL, PLUMBING & ROOFING PERMITS. |
| | WHEN THE GENERAL CONTRACTOR COMES IN FOR A BUILDING |
| | PERMIT WITH THE SIGNED PERMIT APPLICATION FORM BY THE |
| | QUALIFIER AND OWNER AND BRINGS IN THE LISTED |
| | SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE |
| | QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND |
| | LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE |
| | FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN |
| | LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR |
| | EACH PERMIT. |
| | |
| | ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, RACK |
| | STORAGE, EXHAUST HOODS, ANSUL SYSTEMS OR ALTERNATIVE |
| | AUTOMATIC FIRE-EXTINGUISHING SYSTEMS, WALK IN COOLERS & |
| | FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL |
| | TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED |
| | SUB-PERMITS, AWNING, SCREEN ENCLOSURES, CANOPY, FENCE, |
| | LANDSCAPE, IRRIGATION, AUGER CAST PILE AND OR |
| | FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE |
| | REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT. |
| | PLEASE PROVIDE AN ITEMIZED LIST AND SUBTRACT THESE LINE |
| | ITEMS AND THEIR VALUE FROM THE OVERALL BUILDING VALUE |
| | STATED ON THE PERMIT APPLICATION FOR THIS PROJECT. THE |
| | REMAINING BALANCE WILL BE AFFECTIVELY THE VALUE OF THE |
| | BUILDING YOU WILL BE PAYING FOR THIS PERMIT. THE |
| | BUILDING DEPARTMENT DOES NOT WANT TO COLLECT TWICE FOR |
| | THE VALUE OF THESE SUB-PERMITS NOT COVERED UNDER THE |
| | PRIME OR MASTER PERMIT. |
| | |
| | 14) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | JAMES A. WITMER BN, PX, SFP, CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | BUILDING DIVISION / DEVELOPMENT SERVICES DEPARTMENT |
| | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 |
| | TEL: 561-805-6717 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |