Plan Review Notes
Plan Review Notes For Permit 18120887
Permit Number 18120887
Review Stop G
Sequence Number 1
Notes
Date Text
2018-12-31 15:48:1112/31/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1. THE LEGEND OF NUMBER IS NOT CLEAR, PLEASE SIMPLIFY
 BY LABELING THE PIPE SIZE ON THE ISOMETRIC AND GET RID
 OF THE NUMBER, THIS MAKE IF EASIER FOR FIELD
 VERIFICATION, WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 2. SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT
 (DRYER, BBQ AND RANGE TO VERIFY COMPLIANCE WITH 2017
 FBC FUEL GAS RES. SEC. G2408.1.
 3. PLEASE PUT TYPE OF GAS ON ISOMETRIC AND SHOW METER
 (LP OR NATURAL). WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 4. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL
 GAS RES. SEC. G2413.2 AND G2404.3.
 5. A SUB ELECTRICAL PERMIT IS REQUIRED FOR THE SOURCE
 OF IGNITION, WPB AMENDMENTS TO THE FBC SEC. 105.1.
 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017
 FBC FUEL GAS SEC. 304.1, 614.5 (CLOTHES DRYERS) OR 2017
 FBC FUEL GAS RES. SEC. G2407.1 AND G2439.4 (CLOTHES
 DRYERS).
 7. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE ISOMETRIC PLAN PER 2017 FBC FUEL GAS SEC. 402.2
 OR 2017 FBC FUEL GAS RES. SEC. G2413.2.
 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE,
 TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING
 DETAILS OF THE GAS VENT(S) PER 2017 FBC FUEL GAS SECS.
 502 THRU 505 OR 2017 FBC FUEL GAS RES. SECS. G2426 THRU
 G2429.1
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved