| Date |
Text |
| 2019-01-08 12:13:12 | ** FAILED ** |
| | |
| | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| | APPLICABLE: |
| | |
| | 1.) NOT ALL EXISTING STRUCTURES IN THE SURVEY ARE |
| | DEPICTED IN THE SITE PLAN. PLEASE SHOW FOR CONSISTENCY |
| | (I.E. SHED, PAVERED WALKWAY, ETC.). |
| | |
| | 2.) SHOW ALL SETBACK DIMENSIONS FOR THE PROPOSED |
| | ADDITION. NOT ALL SIDES OF THE PROPOSED ADDITION HAVE |
| | BEEN DIMENSIONED. SETBACK DIMENSIONS SHALL BE |
| | CONSISTENT WITH THE MINIMUM REQUIREMENTS IN ZLDR |
| | S.94-72(A)(2). |
| | |
| | 3.) SIDE SETBACK SHALL BE A MINIMUM OF 5 FT. PER SIDE |
| | AND 15 FT. TOTAL ON BOTH SIDES. PROPOSED SIDE SETBACK |
| | DOES NOT MEET THIS REQUIREMENT. PLEASE ADDRESS. [ZLDR |
| | S.94-72(A)(2)] |
| | |
| | 4.) HEIGHT OF THE STRUCTURE SHALL BE MEASURED FROM THE |
| | MEAN GRADE OF THE LOT (NOT AFF) TO THE MID-HEIGHT LEVEL |
| | BETWEEN EAVES AND RIDGE FOR GABLE ROOFS. ALSO NOTE THAT |
| | THE STRUCTURE CANNOT EXCEED 30 FT. IN HEIGHT. [ZLDR |
| | S.94-72(A)(2)] |
| | |
| | 5.) NORTH ELEVATION SEEMS TO BE INCONSISTENT WITH THE |
| | FLOOR PLAN. PLEASE ADDRESS. |
| | |
| | 6.) WILL THE EXISTING DRIVEWAY BE EXTENDED TO THE NEW |
| | GARAGE? IF SO, PLEASE ILLUSTRATE AND PROVIDE |
| | DIMENSIONS, INCLUDING SETBACK(S) FROM THE PROPERTY |
| | LINE(S). ALSO NOTE THAT A MINIMUM OF 1,000 SQ. FT. OF |
| | LANDSCAPED AREA SHALL BE MAINTAINED WITHIN THE REQUIRED |
| | FRONT YARD (FIRST 25 FT. OF THE FRONT PROPERTY LINE). |
| | CALCULATIONS DEMONSTRATING COMPLIANCE IS REQUIRED. |
| | [ZLDR S.94-482(A)] |
| | |
| | 7.) THE VALUE OF THE CONSTRUCTION ($285,000.00) EXCEEDS |
| | 50% OF THE STRUCTURE'S VALUE ($189,617.00) ACCORDING TO |
| | THE P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, |
| | PURSUANT TO SECTION 94-441(C)(2) OF THE ZONING AND LAND |
| | DEVELOPMENT REGULATIONS (ZLDR), THE LANDSCAPE ON THE |
| | SITE SHALL BE IN COMPLIANCE WITH ALL APPLICABLE |
| | REGULATIONS FOUND IN ARTICLE XIV OF THE ZLDR. IF THE |
| | SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) COPIES OF A |
| | LANDSCAPE PLAN DEMONSTRATING COMPLIANCE SHALL BE |
| | INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE SITE DOES |
| | NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE ZONING |
| | APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE PERMIT AND |
| | IRRIGATION PERMIT SHALL BE SUBMITTED SHOWING MATERIAL |
| | TO BRING THE SITE INTO CONFORMITY. |
| | |
| | |
| | NOTES: |
| | |
| | * REVISION MAY RESULT IN ADDITIONAL COMMENTS. |
| | |
| | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE |
| | QUESTIONS. |
| | |
| | * ZONE: SF7 |
| | |
| | * REFERENCE: RESOLUTION NO. 129-15 (ABANDONMENT) |
| | |
| | * NO PERMIT FOR THE EXISTING SHED ALONG THE EAST |
| | PROPERTY LINE. DOES NOT MEET SETBACK. PERMIT REQUIRED |
| | OR REMOVE SHED. |
| | |