| Plan Review Notes For Permit 18120744 |
| Permit Number |
18120744 |
|
| Review Stop |
P |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2019-06-18 12:16:20 | 1) PLACE THE SPECIFIC ADDRESS OF THIS PROJECT ON | | | SHT.SP-1.00. WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) THE RESPONSE NARRATIVE TO COMMENT #2 OF THE REVIEW | | | DONE ON 4/23/19 STATES THAT THE GUTTER DESIGN IS A DECK | | | LEVEL PERIMETER OVERFLOW GUTTER. PERIMETER OVERFLOW | | | GUTTERS SHALL COMPLY WITH 2017 FBC-BUILDING | | | SEC.454.1.6.5.3.1 FOR SPACING REQUIREMENTS. SHT. | | | SP-1.05 SHOWS THE SPACING OF THE DRAINS. | | | 3) PLACE THE CORRECT ADDRESS ON THE POOL SUBMITTAL | | | INFORMATION PACKAGE. WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) SPECIFICATIONS HAVE BEEN SUBMITTED FOR BRINE TANKS | | | BUT I DO NOT SEE THE TANKS ON THE PLANS NOR LISTED IN | | | ANY EQUIPMENT SCHEDULE. CLARIFY. | | | A SEPARATE PERMIT WILL BE REQUIRED FOR THE INSTALLATION | | | OF THE GAS POOL HEATER. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|