| 2020-02-24 18:12:59 | 01/14/2020 RETURNED CALL TO DARREL GRAZIANI(WATER PLANT |
| | MANAGER). HE SAID OK TO PASS BUILDING WITH A PROVISO. |
| | JG. |
| | |
| | |
| | BUILDING REVIEW APPROVED WITH PROVISO: |
| | 1- WATER TREATMENT PLANT ADMINISTRATION BUILDING |
| | -CHEMICAL CONTAINMENT AREAS ENGINEERING SUBMITTED FROM |
| | DARREL J. GRAZIANI, P.E (WATER PLAN MANAGER): |
| | NOTES 1 THRU 3 STATES THAT THE WATER PLANT WILL |
| | INITIATE OPERATIONAL CONTROLS TO LIMIT STORAGE OF |
| | GALLONS IN THE CONTAINMENT AREAS UNTIL MODIFICATIONS TO |
| | THE CONTAINMENT AREAS CAN BE DESIGNED, PERMITTED AND |
| | INSTALLED. PLEASE FOLLOW UP. |
| | |
| | 2- ARCHITECT OF RECORD TO REVISE THE STRUCTURAL DESIGN |
| | CRITERIA & CODES INFORMATION ON SHEET A4.0. |
| | (A) ESSENTIAL FACILITY, ULTIMATE DESIGN WIND SPEED IS |
| | 180 NOT 170. SEE FIGURE 1609.3(2) FBC AND CITY |
| | AMENDMENTS SEC. 120 CITY AMENDMENTS. NOTE: THIS |
| | BUILDING IS IN EXPOSURE D NOT C. REVISE AS REQUIRED. |
| | (B) REVISE THE DOORS DESIGN PRESSURES TO CORRESPOND TO |
| | THE REVISION REQUIRED ABOVE. |
| | (C) REVISE THE REFERENCED ASCE-7. THE CORRECT REFERENCE |
| | IS THE ASCE 7-10 NOT ASCE 7-16. REVISE AS REQUIRED. |
| | |
| | 3- ALL EXIT DOORS NEED TO HAVE PANIC HARDWARE. SEC. |
| | 1010.1.10 FBC. ARCHITECT TO REVISE DOOR HARDWARE |
| | SCHEDULE (INCLUDING THE EXISTING DOOR E1). |