| 2019-02-08 15:21:16 | CITY OF WEST PALM BEACH CODE OF ORDINANCES, SECTION |
| | 94-35, SITE PLAN REVIEW |
| | |
| | (C) SITE DESIGN QUALITATIVE DEVELOPMENT STANDARDS. |
| | (11) STORMWATER CONTROL. APPROPRIATE MEASURES SHALL BE |
| | TAKEN TO ENSURE THAT REMOVAL OF STORMWATER WILL NOT |
| | ADVERSELY AFFECT NEIGHBORING PROPERTIES OR THE PUBLIC |
| | STORM DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE FOR THE |
| | CONSTRUCTION OF FACILITIES, INCLUDING GRADING, GUTTERS, |
| | PIPING AND THE TREATMENT OF TURF, TO ACCOMMODATE |
| | STORMWATER AND TO PREVENT EROSION AND THE FORMATION OF |
| | SILT. |
| | |
| | WATER QUALITY CRITERIA |
| | RETENTION/DETENTION REQUIREMENTS |
| | 1. VOLUME IS CALCULATED AS: |
| | WET DETENTION VOLUME SHALL BE PROVIDED FOR THE FIRST |
| | INCH OF RUNOFF FROM THE DEVELOPED PROJECT, OR THE TOTAL |
| | RUNOFF OF 2.5-INCHES TIMES THE PERCENTAGE OF |
| | IMPERVIOUSNESS, WHICHEVER IS GREATER, |
| | |
| | FOR ANY RECONSTRUCTION OF A PARKING LOT, THE OWNER |
| | SHOULD INSTALL A DRAINAGE SYSTEM TO PROVIDE WATER |
| | QUALITY TREATMENT OF THE STORMWATER RUNOFF, WHETHER IT |
| | BE PERVIOUS PAVERS, AN EXFILTRATION TRENCH, OR |
| | BIOSWALE. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | MANNY GONZALEZ |
| | SENIOR ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | |
| | DIRECT: (561) 818-1322 |
| | |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | CENTRAL OPERATIONS CENTER (DISPATCH): |
| | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC |
| | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 |
| | |