Plan Review Notes
Plan Review Notes For Permit 18111241
Permit Number 18111241
Review Stop P
Sequence Number 2
Notes
Date Text
2019-03-19 11:40:371) THE SPECIFICATION SHEETS THAT HAVE BEEN SUBMITTED
 FOR THE COMPRESSOR, THE DRYER, THE RECEIVER AND THE
 FILTERS DO MATCH THE EQUIPMENT CALLED OUT FOR ON THE
 PLANS. THE PLANS CALL OUT INGERSOLL-RAND EQUIPMENT BUT
 THE SPECS ARE FOR KAESER AND CHAMPION EQUIPMENT. ALSO,
 SEE SHT.P-1 UNDER THE "REMARKS" BOX. CLARIFY.
 2) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION MANUALS FOR THE OIL/WATER SEPARATOR, THE
 PNEUMATIC NO-LOSS DRAIN, THE RECEIVER, THE DRYER AND
 THE COMPRESSOR. WPB AMEND. TO FBC SEC. 107.2.1.
 3) ALL INFORMATION, DRAWINGS,SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN. THE
 MANUFACTURER'S SPECIFICATION SHEETS SHALL BE STAMPED BY
 THE E.O.R. WPB AMEND. TO FBC SEC. 107.2.1.
 4) THE AIR PIPING ISOMETRIC ON SHT. P-3 SHOWS A 1 1/2
 INCH INLET AND OUTLET AT THE DRYER BUT A SIZE OF 1 INCH
 IS CIRCLED ON THE TECHNICAL SPECIFICATION PAGE OF THE
 DRYER SPECIFICATIONS. CLARIFY.
 5) A PRESSURE GAUGE AND THERMOMETER ARE REQUIRED ON THE
 AIR COMPRESSOR PER SHT.P-1, NOTE #3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  