| Plan Review Notes For Permit 18111241 |
| Permit Number |
18111241 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-03-19 11:40:37 | 1) THE SPECIFICATION SHEETS THAT HAVE BEEN SUBMITTED | | | FOR THE COMPRESSOR, THE DRYER, THE RECEIVER AND THE | | | FILTERS DO MATCH THE EQUIPMENT CALLED OUT FOR ON THE | | | PLANS. THE PLANS CALL OUT INGERSOLL-RAND EQUIPMENT BUT | | | THE SPECS ARE FOR KAESER AND CHAMPION EQUIPMENT. ALSO, | | | SEE SHT.P-1 UNDER THE "REMARKS" BOX. CLARIFY. | | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS AND | | | INSTALLATION MANUALS FOR THE OIL/WATER SEPARATOR, THE | | | PNEUMATIC NO-LOSS DRAIN, THE RECEIVER, THE DRYER AND | | | THE COMPRESSOR. WPB AMEND. TO FBC SEC. 107.2.1. | | | 3) ALL INFORMATION, DRAWINGS,SPECIFICATIONS AND | | | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF | | | THE PERSON RESPONSIBLE FOR THE DESIGN. THE | | | MANUFACTURER'S SPECIFICATION SHEETS SHALL BE STAMPED BY | | | THE E.O.R. WPB AMEND. TO FBC SEC. 107.2.1. | | | 4) THE AIR PIPING ISOMETRIC ON SHT. P-3 SHOWS A 1 1/2 | | | INCH INLET AND OUTLET AT THE DRYER BUT A SIZE OF 1 INCH | | | IS CIRCLED ON THE TECHNICAL SPECIFICATION PAGE OF THE | | | DRYER SPECIFICATIONS. CLARIFY. | | | 5) A PRESSURE GAUGE AND THERMOMETER ARE REQUIRED ON THE | | | AIR COMPRESSOR PER SHT.P-1, NOTE #3. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | | | | | | | |
|