| Date |
Text |
| 2018-12-10 12:36:59 | ** FAILED ** |
| | |
| | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| | APPLICABLE: |
| | |
| | 1.) INCONSISTENCIES DETECTED BETWEEN THE SURVEY OF THE |
| | PROPERTY AND THE PROPOSED SITE PLAN (I.E. BUILDING |
| | FOOTPRINT AND SETBACK DIMENSIONS, PAVED AREAS, FENCE |
| | ALONG THE PROPERTY LINE, ETC.). PLEASE ADDRESS FOR |
| | CONSISTENCY. |
| | |
| | 2.) PER THE SURVEY, THERE IS AN EXISTING 3 FT. UTILITY |
| | EASEMENT (U.E.) LOCATED ALONG THE REAR PROPERTY LINE. |
| | PLEASE SHOW IN THE SITE PLAN (SHEET A001). |
| | |
| | 3.) CHECK CALCULATIONS AND MEASUREMENTS IN THE ZONING |
| | DATA TABULAR ON SHEET A001. STAFF HAS DETECTED MULTIPLE |
| | INCORRECT DIMENSIONS AND CALCULATIONS. PLEASE CORRECT. |
| | |
| | 4.) THE MINIMUM REQUIRED REAR SETBACK IS 8.9 FT. THE |
| | SITE PLAN SHOWS A PROPOSED BUILDING REAR SETBACK OF 8.8 |
| | FT. PLEASE REVISE TO SHOW MINIMUM REQUIRED REAR |
| | SETBACK. [ZLDR S.94-74(A)(3)(C)] |
| | |
| | 5.) STRUCTURAL OVERHANGS SHALL NOT EXTEND FARTHER THAN |
| | 3 FT. INTO A REQUIRED SETBACK. PLEASE PROVIDE |
| | DIMENSIONS TO DEMONSTRATE COMPLIANCE. [ZLDR |
| | S.94-305(B)(2)] |
| | |
| | 6.) MECHANICAL EQUIPMENT (INCLUDING A/C COMPRESSOR UNIT |
| | AND POOL EQUIPMENT PAD(S)) MAY NOT PROJECT MORE THAN 4 |
| | FT. INTO A REQUIRED SETBACK. PLEASE PROVIDE THE WIDTH |
| | OF THE CONCRETE PAD TO DEMONSTRATE COMPLIANCE. [ZLDR |
| | S.94-305(B)(4)] |
| | |
| | 7.) SHOW WIDTH AND LENGTH OF THE PROPOSED NEW DRIVEWAY. |
| | THE DRIVEWAY CANNOT EXCEED 20 FT. IN WIDTH. [ZLDR |
| | S.94-312(1)(C)] |
| | |
| | 8.) THE VALUE OF THE CONSTRUCTION ($249,000.00) EXCEEDS |
| | 50% OF THE STRUCTURE'S VALUE ($105,215.00) ACCORDING TO |
| | THE P.B.C. PROPERTY APPRAISER'S OFFICE; THEREFORE, |
| | PURSUANT TO SECTION 94-441(C)(2) OF THE ZONING AND LAND |
| | DEVELOPMENT REGULATIONS (ZLDR), THE LANDSCAPE ON THE |
| | SITE SHALL BE IN COMPLIANCE WITH ALL APPLICABLE |
| | REGULATIONS FOUND IN ARTICLE XIV OF THE ZLDR. IF THE |
| | SITE CONFORMS TO ARTICLE XIV, THEN TWO (2) COPIES OF A |
| | LANDSCAPE PLAN DEMONSTRATING COMPLIANCE SHALL BE |
| | INCLUDED WITH THE PERMIT RE-SUBMITTAL. IF THE SITE DOES |
| | NOT CONFORM TO ARTICLE XIV, THEN PRIOR TO THE ZONING |
| | APPROVAL OF THIS PERMIT A SEPARATE LANDSCAPE PERMIT AND |
| | IRRIGATION PERMIT SHALL BE SUBMITTED SHOWING MATERIAL |
| | TO BRING THE SITE INTO CONFORMITY. |
| | |
| | 9.) PER ZLDR S.94-482, THE REQUIRED FRONT YARD (AREA |
| | WITHIN THE FIRST 25 FT. OF MONCEAUX ROAD) SHALL PROVIDE |
| | A MINIMUM OF 1,000 SQ. FT. OF LANDSCAPED/PERVIOUS |
| | SURFACE AREA CONSISTING OF LIVING PLANT MATERIAL. SHOW |
| | CALCULATIONS OF REQUIRED FRONT YARD TO DEMONSTRATE |
| | COMPLIANCE. |
| | |
| | 10.) SHOW SETBACK DIMENSIONS FOR THE PROPOSED NEW |
| | DRIVEWAY. THE DRIVEWAY MUST BE SETBACK AT LEAST 3 FT. |
| | FROM THE SIDE PROPERTY LINE. [ZLDR S.94-482(D)(2)] |
| | |
| | 11.) A MINIMUM OF TWO (2) PARKING SPACES SHALL BE |
| | PROVIDED ON SITE. PLEASE DEMONSTRATE THAT THE DRIVEWAY |
| | IS SUFFICIENT TO ACCOMMODATE THE MINIMUM REQUIRED |
| | PARKING, SINCE THERE IS NO GARAGE STRUCTURE. |
| | |
| | |
| | NOTES: |
| | |
| | * SEPARATE PERMITS REQUIRED FOR THE FOLLOWING: |
| | LANDSCAPING, DRIVEWAY/WALKWAY, SWIMMING POOL, NEW |
| | FENCE/GATE. |
| | |
| | * REVISION MAY RESULT IN ADDITIONAL COMMENTS. |
| | |
| | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE |
| | QUESTIONS. |
| | |
| | * ZONE: SF14 |
| | |