Plan Review Notes
Plan Review Notes For Permit 18110298
Permit Number 18110298
Review Stop P
Sequence Number 1
Notes
Date Text
2018-12-05 08:50:111) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC
 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION
 ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT
 REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED
 THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET
 FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS
 MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING
 SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER,
 FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT
 THE PUMP.
 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE.
 IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC
 TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS
 NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH
 CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1
 3) GAS FIRED POOL HEATERS SHALL HAVE A MINIMUM THERMAL
 EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC.
 R403.10.4. THE SUBMITTED SPECS DO NOT SHOW THIS.
 4) SHT. 2 - APSP/ANSI -15 BOX NOTES NO HEATER YET THE
 PIPING SCHEMATIC SHOWS A HEATER. IS ONE BEING INSTALLED
 OR NOT? IF NOT REVISE THE NOTE.
 5) SHT. 1 - THE EQUIPMENT SPECS CALL OUT PUMP MODEL
 VSSHP270AUT AND SHT. 2 PIPING SCHEMATIC CALLS OUT PUMP
 VSSHP220AUT. CLARIFY.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  