| 2019-08-14 10:35:51 | PLUMBING NOTE: PROVISO THESE ITEMS TO BE ADDRESSED |
| | BEFORE FIRST INSPECTION. |
| | |
| | THE VENT FOR THE BAR AREA THRU THE SIDE WALL SHALL |
| | COMPLY WITH. |
| | FBC PL 903.6 EXTENSION THROUGH THE WALL. |
| | VENT TERMINALS EXTENDING THROUGH THE WALL SHALL |
| | TERMINATE AT A POINT NOT LESS THAN 10 FEET (3048 MM) |
| | FROM A LOT LINE AND NOT LESS THAN 10 FEET (3048 MM) |
| | ABOVE AVERAGE GROUND LEVEL. VENT TERMINALS SHALL NOT |
| | TERMINATE UNDER THE OVERHANG OF A STRUCTURE WITH SOFFIT |
| | VENTS. SIDE WALL VENT TERMINALS SHALL BE PROTECTED TO |
| | PREVENT BIRDS OR RODENTS FROM ENTERING OR BLOCKING THE |
| | VENT OPENING. |
| | |
| | |
| | A) SEPARATE PERMIT IS REQUIRED FOR BACKFLOW ASSEMBLIES |
| | PER WPB UTILITIES. |
| | B) SEPARATE PERMIT IS REQUIRED FOR THE GREASE |
| | INTERCEPTOR |
| | C) SEPARATE PERMIT IS REQUIRED FOR GENERATOR AND FUEL |
| | SYSTEM |
| | D) SEPARATE PERMIT IS REQUIRED FOR FUEL GAS |
| | E) KITCHEN IS PERMITTED AS VENILLA SHELL SEPARATE |
| | PERMIT REQUIRED FOR BUILD OUT OF KITCHEN INCLUDING |
| | GREASE INTERCEPTOR CALCULATIONS. |
| | |
| | PLUMBING PROVISO |
| | 1. ALL WORK PER CITY CODES SUBJECT TO FIELD INSPECTOR?S |
| | APPROVAL. |
| | 2. ALL PLUMBING WORK SHALL COMPLY WITH FBC PLUMBING 6TH |
| | EDITION 2017 |
| | 4. A SEPARATE PERMIT IS REQUIRED FOR GREASE INTERCEPTOR |
| | PER WPB UTILITIES. |
| | 5. TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES |
| | AND GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET |
| | FACILITIES PROVIDED FOR CUSTOMERS, PATRONS AND |
| | VISITORS. TEMPERED WATER SHALL BE DELIVERED THROUGH AN |
| | APPROVED WATER-TEMPERATURE LIMITING DEVICE THAT |
| | CONFORMS TO ASSE 1070 OR CSA B125.3.PER FBC PL 416.5 |
| | 6. BACKFLOW DEVICE REQUIRED ON ALL EQUIPMENT CONNECTED |
| | TO THE POTABLE WATER SYSTEM. FBC PL 608.3, 608.16.1, |
| | 608.16.10 |
| | 7. THE ELEVATOR SUMP PUMP SHALL DISCHARGE THROUGH AN |
| | OIL SEPARATOR OR THE PUMP SHALL BE AN OIL MINDER TYPE. |
| | PER FBC PL 1003.4 |
| | 8. THE GREASE INTERCEPTOR SHALL BE INSTALLED PER |
| | MANUFACTURE INSTALLATION GUIDE AND HAVE 4? CLEAN ON |
| | DISCHARGE FOR A SAMPLING PORT. PER WPB UTILITIES DEPT. |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |