| 2018-11-01 08:48:46 | RESIDENTIAL (R3) SHUTTERS INSTALLATION BUILDING REVIEW |
| | COMMENTS |
| | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| | |
| | 1- SHUTTERS INSTALLATION SCHEDULE IS INCOMPLETE AND |
| | SOME ITEMS NEED TO BE REVISED. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | A) SPECIFY ANCHOR SPACING (TOP AND BOTTOM). NOTE: |
| | ANCHOR SPACING IS BASED ON THE SUBSTRATE MATERIAL. |
| | TYPICALLY, THE POURED CONCRETE ANCHOR SCHEDULE IS USED |
| | FOR TOP ANCHORS AND CONCRETE BLOCK ANCHOR SCHEDULE IS |
| | USED FOR BOTTOM ANCHORS UNLESS CONTRACTOR PROVES THAT |
| | THE OPENING SILL IS POURED CONCRETE ALSO WITH THE |
| | REQUIRED CONCRETE STRENGTH. |
| | |
| | B) SHUTTERS INSTALLATION SCHEDULE SPECIFIES THE DESIGN |
| | PRESSURES FOR ALL OPENINGS USING THE SAME EFFECTIVE |
| | WIND AREA. THE DESIGN PRESSURES ARE TAKEN BASED ON THE |
| | EFFECTIVE WIND AREA OF EACH OPENING. PROVIDE THE |
| | CORRECT DESIGN PRESSURES BASED ON THE ACTUAL EFFECTIVE |
| | WIND AREA OR PROVIDE THE DESIGN PRESSURES FOR THE WORST |
| | SCENARIO (SMALLEST EFFECTIVE WIND AREA). REVISE |
| | INSTALLATION SCHEDULE AS REQUIRED. |
| | |
| | C) CLEARLY SPECIFY THE SHUTTER MOUNTING CONDITION ON |
| | COLUMN #4 OF INSTALLATION SCHEDULE. FOR EXAMPLE WALL |
| | DETAIL "A" OR WALL DETAIL "D". SEE SHEET 6 OF 20 OF |
| | SHUTTERS DRAWINGS. NOTE: W IS NOT A MOUNTING CONDITION. |
| | REVISE AS REQUIRED. |
| | |
| | D) REVISE SHUTTER GLASS SEPARATION ON COLUMN #5 OF |
| | INSTALLATION SCHEDULE. SEE SHEET 11 OF 20 FOR DIFFERENT |
| | SCENARIOS BASED ON THE NUMBER OF SHUTTER LOCKS AND |
| | NUMBER OF LOCKING RODS. REVISE AS REQUIRED AND CLEARLY |
| | SPECIFY NUMBER OF LOCKS AND LOCKING RODS. OR PROVIDE |
| | THE GLASS SEPARATION DISTANCE THAT COVERS ALL |
| | SCENARIOS. |
| | |
| | E) REVISE THE ANCHOR EDGE DISTANCE ON COLUMN 8 OF |
| | SHUTTERS INSTALLATION SCHEDULE. SEE SHEET 13 OF 20 FOR |
| | EDGE DISTANCE VS SPACING SCHEDULE FOR ANCHORS. ANCHORS |
| | SPACING MAY HAVE TO BE REDUCED BASED ON THE ACTUAL EDGE |
| | DISTANCE. NOTE: SEE SPECIFICATIONS ON ANCHOR |
| | REQUIREMENTS ON SAME PAGE FOR ANCHOR MINIMUM EMBEDMENT |
| | REQUIRED INTO CONCRETE OR CONCRETE BLOCK. |
| | |
| | F) CLEARLY IDENTIFY SUBSTRATE MATERIAL (TOP AND BOTTOM) |
| | ON COLUMN 10 OF INSTALLATION SCHEDULE. COORDINATE WITH |
| | ITEM #1(A) ABOVE. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |